Laserfiche WebLink
[See Table 6 of this Article for explanation of symbols] <br />The value of Cp need not exceed the values set forth in Table 1 of this Article. <br />Alternative lateral force procedures using rational analyses based on well <br />established principles of mechanics maybe used in lieu of those prescribed in <br />these provisions. <br />(c) Anchora eg and Interconnection. Anchorage and interconnection of all parts, <br />portions and elements of the building shall be analyzed and designed for lateral <br />forces in accordance with Table 1 of this Article and the equation Fp = CpWp. <br />Minimum anchorage of masonry walls to each floor or roof shall resist a <br />minimum force of 200 pounds per linear foot acting normal to the wall at the level <br />of the floor or roof. <br />(d) Level of Required Repair. Alterations and repairs required to meet the provisions <br />of this Article shall comply with all other applicable requirements of the Uniform <br />Building Code unless otherwise specifically provided for in this Article. <br />(e) Required Analysis. <br />(1) General. Except as modified herein, the analysis and design relating to the <br />structural alteration of existing buildings not meeting the minimum <br />standards for seismic resistance established by this Article shall be in <br />accordance with the analysis specified in Chapter 23 of the Uniform <br />Building Code. <br />(2) Continuous Stress Path. A complete, continuous stress path from every <br />part or portion of the building to the ground shall be provided for the <br />required horizontal forces. <br />(3) Positive Connections. A11 parts, portions or elements of the building shall <br />be interconnected by positive means. <br />(f) Analysis Procedure. <br />(1) General. Stresses in materials and existing construction utilized to transfer <br />seismic forces to the ground from parts or portions of the building shall <br />conform to those permitted by the Uniform Building Code and those <br />materials and types of construction specified in Section 7-5-865. <br />(2) Connections. Materials and connectors used for interconnection of parts <br />and portions of the building shall conform to the Uniform Building Code. <br />Nails maybe used as part of an approved connector. <br />6 <br />