My WebLink
|
Help
|
About
|
Sign Out
Home
8K Consent 2008 0721
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2008
>
Packet 2008 0721
>
8K Consent 2008 0721
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 1:41:08 PM
Creation date
7/18/2008 1:41:08 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/21/2008
Retention
PERM
Document Relationships
_CC Agenda 2008 0721
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2008\Packet 2008 0721
Reso 2008-088
(Reference)
Path:
\City Clerk\City Council\Resolutions\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAN LEANDRO <br />STAFF REPORT <br />DATE: <br />TO: <br />FROM: <br />BY: <br />July 21, 2008 <br />John Jermanis, City Manager x~`~ <br />Uchenna Udemezue Director <br />APPROVED AND <br />FORWARDED <br />TO CITY COUNCIL <br />Jo .~Jermanis <br />Ci anager <br />Engineering and Transportation D artment <br />Kenneth Joseph, City Engineer <br />Engineering and Transportation Department <br />SUBJECT PROJECT/PROJECT DESCRIPTION: <br />RESOLUTION APPROVING A CONTRACTUAL SERVICES AGREEMENT WITH <br />SKYLINE ENGINEERING, INC., RELATED TO THE ROOF REPAIR AND <br />REPLACEMENT PROJECT, PHASE III, PROJECT NO. 687-18-104. <br />SUMMARY AND RECOMMENDATION <br />Staff recommends approval of a contractual services agreement with Skyline Engineering, Inc. in <br />the amount of $45,950.00 to provide professional design services and construction support for <br />the subject project. <br />BACKGROUND <br />In 2006, a roof survey was conducted by Skyline Engineering to evaluate the condition of all <br />roofs on City-owned buildings. The survey included an assessment of roof condition and a <br />budgetary estimate for repair/replacement. Several roofs were found in poor condition, and <br />repairs and/or replacement were recommended. Phase I of this project is near completion and <br />included the Marina Community Center and the Public Safety Building. Phase II of this project <br />is currently in design and involves roofs at the Main Library's Karp Room, Fire Station #12, <br />Public Works Shipping/Receiving area and the South Offices Mechanical area. <br />This contract is for Phase III, which will repair and/or replace the following roofs: City Hall; the <br />Building/Electrical, Streets/Landscaping, and Fuel/Records shed at the Public Works Service <br />Center; the Cherry Grove Park Maintenance building; one score booth at San Leandro Ball Park <br />and two at Pacific Ball Park; and the Park Median Crew shed near the Marina. <br />Designs for Phases II and III will be combined into a single construction project scheduled for <br />Spring of 2009. <br />Analysis <br />Based on Skyline Engineering's extensive experience with re-roofing projects for various <br />government agencies within Alameda County coupled with its satisfactory performance in the <br />
The URL can be used to link to this page
Your browser does not support the video tag.