My WebLink
|
Help
|
About
|
Sign Out
Home
2D Business 2008 0728
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2008
>
Packet 2008 0728
>
2D Business 2008 0728
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2008 9:03:35 AM
Creation date
7/25/2008 9:03:35 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/28/2008
Retention
PERM
Document Relationships
_CC Agenda 2008 0728
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2008\Packet 2008 0728
RDA Reso 2008-019
(Reference)
Path:
\City Clerk\City Council\Resolutions\2008
Reso 2008-094
(Reference)
Path:
\City Clerk\City Council\Resolutions\2008
Reso 2008-095
(Reference)
Path:
\City Clerk\City Council\Resolutions\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Applicable General Plan Policy <br />• Policy 50.01--Access to senior services should be improved through planning, advocacy, and <br />the use of City resources to address identified needs <br />• Action 5.01-A Develop a Senior Center <br />Permits and/or Variances Granted <br />• This project is consistent with zoning for the area as well as the East 14th Street South Area <br />Development Strategy <br />• No variance is anticipated <br />Environmental Review <br />• The project is categorically exempt <br />Code Compliance Review <br />• A City of San Leandro Building Permit will be obtained for this wank <br />• A permit has been obtained from the Alameda County Flood Control for connection to its <br />storm drain <br />Board/Commission Findings <br />• The Senior Commission provided input on the conceptual design and will continue to <br />participate as the project progresses <br />• A general update on this project was given to the Redevelopment Agency Joint Project Area <br />(JPA) RAC on November 15, 2006 <br />Summary of Public Outreach Efforts <br />• Two community meetings were held as part of the needs assessment and conceptual design <br />phase; input was solicited on site selection and building/program features <br />• No further public meetings are anticipated <br />Fiscal Impact <br />• The Public Works Department estimated that the Phase 2 building improvements will <br />increase annual maintenance costs by $216,000 <br />• The Recreation and Human Services Department estimated that the annual operating costs to <br />manage the Senior Center will cost approximately $363,000 <br />• Projected Phase 2 project costs are estimated at $14,000,000, which includes construction of <br />Phase 2 improvements, consultant construction administration, material testing and <br />inspections services and utility services connections <br />• Funding for the building fixtures, furnishings, and equipment (FF&E) will be requested <br />separately as needed based on actual Phase 2 project costs <br />
The URL can be used to link to this page
Your browser does not support the video tag.