My WebLink
|
Help
|
About
|
Sign Out
Home
3B Public Hearing 2008 0915
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2008
>
Packet 2008 0915
>
3B Public Hearing 2008 0915
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2008 9:50:19 AM
Creation date
9/12/2008 9:50:18 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
9/15/2008
Retention
PERM
Document Relationships
_CC Agenda 2008 0915
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2008\Packet 2008 0915
Reso 2008-114
(Reference)
Path:
\City Clerk\City Council\Resolutions\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit C <br />Performance Guarantee & Performance Assurance <br />A. City Obli atg ions <br />1. Provide daily average of 134,506 CFD of digester gas as measured by a flow meter, <br />which shall measure the flow and log data at specified intervals; <br />2. Provide digester gas with lower heating value BTU content of at least b06 BTU/FT3 <br />as determined through lab analysis or meter. <br />B. Siemens Obligations <br />1. Contractor shall maintain the work in accordance with Exhibit A-2; <br />2. The total run time of the three individual engines shall be a combined minimum of <br />24,000 hours annually (baseline production) as logged by onboard hour meters; <br />3. When an engine is running it will produce electrical energy within the associated <br />generator's normal published operating range as logged by an onboard energy (kWh) <br />meter; <br />4. Siemens will provide information regarding the system operation in accordance with <br />Exhibit A-3 Measurement and Verification. <br />C. If City does not meet its obli ate ions <br />1, Baseline production hours will be reduced if the required quantity and/or quality of <br />digester gas is unavailable, as reconciled on an as-needed basis for quality and on a <br />daily basis for quantity; <br />2. If a generator is not producing electrical energy, a record of the time will be logged, <br />and if the cause is determined to be a lack of quality or quantity of digester gas, the <br />run time hour for that engine will be deducted from the Baseline Production. <br />D. If Siemens does not meet its obli ations <br />1. If generator is not producing electrical energy, a record of the time will be logged, <br />and if the cause is determined not to be due to Section A of this Exhibit C, the run <br />time hour for that engine will be counted in the Baseline Production and not as a run <br />time hour; <br />2. A performance reconciliation shall be conducted after each Annual Period. If the <br />aggregate uptime for the three engines is 24,000 hours or more for the Annual Period, <br />Siemens will have met its Performance Guarantee for the year and no shortfall <br />payment shall be due. However, if the aggregate uptime for the three engines is less <br />than 24,000 hours for the Annual Period, Siemens will not have met its Performance <br />Guarantee and a shortfall payment will be owed. Accordingly, Siemens will use the <br />following equation to calculate the payment: Shortfall (Hrs) x Net Coggin Plant <br />Output (kW) x WPCP's most recent Annual Period blended utility rate ($/kWh). The <br />resulting shortfall payment will be in the form of a credit to the continuing <br />maintenance costs of the generation facility. THE PARTIES ACKNOWLEDGE <br />WPCP Cogeneration 090808 -Page 53 of 60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.