My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2008 Siemens Building Technologies Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2008
>
Agmt 2008 Siemens Building Technologies Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2009 12:25:35 PM
Creation date
9/22/2008 3:08:04 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
9/15/2008
Retention
PERM
Document Relationships
_CC Agenda 2008 0915
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2008\Packet 2008 0915
Reso 2008-114
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
application) provided the City issues its Notice To Proceed by October 1, 2008. <br />15.1.2 Project Schedule. Within seven (7) calendar days after the Notice to <br />Proceed, Siemens shall submit a detailed Master Schedule of Work consistent with the <br />Exhibit B-2 Milestone Schedule. The Schedule of Work shall show each milestone, the <br />sequence of each activity, the number of days required to complete each task, as well as <br />showing all field construction operations, compliance and shop drawing submittals, <br />procurement of material and equipment furnished by Siemens, equipment installation and <br />testing, float time and the critical path of controlling operations necessary to complete the <br />Work. <br />Siemens shall provide a monthly updated schedule, and document any deviations from the <br />Master Schedule of Work and appropriate recovery steps to bring the projects into <br />conformance with the Master Schedule of Work, as required. <br />15.1.3 Liquidated Damages. Time is of the essence in this Agreement. By <br />execution of the Agreement, the City and the Siemens (and its subcontractors) agree that it <br />will be difficult or impossible to determine the actual damage that the City will sustain in the <br />event of Siemens' failure to fully perform the Work or to fully perform all of Siemens' <br />obligations that have accrued pursuant to the Agreement by the time for completion. <br />Siemens acknowledges that the timely completion of the Work is essential to receiving a <br />Self-Generation Incentive Program (SGIP) incentive in the amount of $255,000; therefore, <br />Siemens will adjust its schedule and provide the necessary labor and Equipment to meet the <br />incentive requirements. If the SGIP incentive is not obtained, and Siemens is found to be the <br />sole cause of such failure, then the City and Siemens agree in accordance with California <br />Government Code Section 53069.85 that Siemens will forfeit and pay to the City the sum of <br />$255,000 as liquidated damages. The City and Siemens further agree in accordance with <br />California Government Code Section 53069.85 that the liquidated damages sum specified in <br />this Section is not manifestly unreasonable under the circumstances existing at the time the <br />Agreement was made, and that the City may deduct liquidated damages sums in accordance <br />with this Section from any payments due or that may become due Siemens under this <br />Agreement. <br />In the event that delay is concurrently caused by Siemens and the City or a third party, not <br />including Siemens' agents or subcontractors, liquidated damages will be determined by <br />assessing Siemens' proportionate responsibility for delay and applying that proportionate <br />share to the $255,000 forfeiture. <br />Section 16. CHANGE TO PROJECT SCHEDULE. <br />16.1.1 The Project Schedule may only be changed by change order or written <br />amendment and all time limits stated in the Contract Documents are of the essence of the <br />Agreement. <br />Section 17. TERMINATION AND MODIFICATION. <br />WPCP Cogeneration 090808 -Page 24 of 60 <br />