My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent 2008 1006
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2008
>
Packet 2008 1006
>
8G Consent 2008 1006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2008 9:59:13 AM
Creation date
10/3/2008 9:59:12 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
10/6/2008
Retention
PERM
Document Relationships
_CC Agenda 2008 1006
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2008\Packet 2008 1006
Reso 2008-125
(Reference)
Path:
\City Clerk\City Council\Resolutions\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />COMPENSATION SCHEDULE <br />The following is a summary of testing and inspection fees, followed by a detailed breakdown: <br />1. Reinforced Concrete: <br />2. Structural Steel: <br />3. Expansion 8~ Epoxy Anchors: <br />4. Grouting: <br />5. Mileage Allowance: <br />6. Project Management: <br />7. Final Affidavit: <br />$14,148.00 <br />$45,320.00 <br />$3,120.00 <br />$3,870.00 <br />$2,500.00 <br />$5,200.00 <br />$ 500.00 <br />Total 74 658.00 <br />DETAILED BREAKDOWN OF FEES <br />1. Reinforced Concrete <br />a) Mix Design Reviews: Three @ $ 100.00 300.00 <br />b) Reinforcing sampling: Ten, 2 hr trips; 20 hours @ $ 78.00 per hr 1,560.00 <br />d) Concrete placement: 48 hours @ $ 78.00 per hour 3,744,00 <br />e) Reinforcing tension tests: 20 tests @ $ 75,00 each 1,500,00 <br />f) Reinforcing bend tests: 20 tests @ $ 75.00 each 1,500.00 <br />g) Concrete Cylinders: Twelve sets @ $ 150.00 per set 1,800.00 <br />h) Batch Plant Inspection: 48 hours ~ $ 78.00 per hour (Ootionall 3.744.00 <br />Structural Steel Weldino: <br />3 <br />4 <br />5. <br />Sub-Total $14,148.00 <br />a) Welding Procedure Review: 4 hours @ $130.00 per hour 520.00 <br />b) Shop Welding Inspections: 350 hours @ $ 50.00 per hour 17,500.00 <br />c) Field Welding Inspections: 350 hours (a) $ 78.00 per hour 27,300.00 <br /> Sub-Total $45, 320.00 <br />Exp ansion & Adhesive Anchors: <br />a) Anchor Tests: 40 hours @ $ 78.00 per hour $3 120.00 <br /> Sub-Total $3,120.00 <br />Grouting of Brace Frame Columns: <br />a) Grout inspections: 40 hours @ $ 78.00 per hour 3,120.00 <br />b) Grout test samples; 5 sets ~ $150.00 per set 750.00 <br /> Sub-Total $3, 870.00 <br />Mileage allowance: <br />Sub-Total <br />$2, 500.00 <br />6. Project Management: 40 hours @ $ 130.00 Sub-Tots! $5,200.00 <br />7. Final Affidavit: Sub-Total $500 00 <br />Total : 74 658.00 <br />CSA between City of San Leandro and Applied Materials & Engineering, Inc Project No. 06-210-18-116 <br />San Leandro Senior Center -Phase 2 Exhibit B Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.