Laserfiche WebLink
Redevelopment Agency Plan <br />The 2004-09 Implementation Plan includes the <br />expansion and seismic retrofit of the Estudillo- <br />Callan Parking Garage as a priority to provide <br />increased parking for downtown businesses <br />and customers <br />The 2007 Mid-Term Review indentified <br />implementation of the TOD Strategy as an <br />objective, including the design and construction <br />of an approximately 500-space parking garage <br />to serve the downtown (Plaza & Joint Project <br />Areas) na~pi~a uaa ~ zno7 <br />General Plan Policy <br />Goa16 -Downtown Revitalization <br />Section 6.07 Parking <br />"Ensure that parking for Downtown businesses remains <br />convenient, but take steps which de-emphasize surface <br />parking lots as a dominate feature of the Downtown <br />landscape. Establish satellite parking areas, including <br />attractively designed parking structures, accessed by well- <br />, defined and inviting pedestrian passageways.' <br />Action 6.07-A: Downtown Parking Structure <br />`Study the teasibility of developing an attractively designed <br />Downtown parking structure or expanding and redesigning <br />the existing Cityowned Downtown parking garage <br />Adopted 2b02 <br />Design Elements <br />Demolish the existing structure and construct a new <br />4-level parking garage <br />4D0 vehicle capacity <br />Provide an elevator at the plaza location (elevator <br />walls of glass to enhance visibility and security) <br />Open stairways to enhance visibility and security <br />"- Architectural features on Callan and Estudillo <br />frontages to complement adjacent building styles <br />2,000 sf commercial space at the Estudillo frontage <br />5 <br />