My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2008 1103
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2008
>
Packet 2008 1103
>
8E Consent 2008 1103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2008 10:21:00 AM
Creation date
10/31/2008 10:20:59 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
11/3/2008
Retention
PERM
Document Relationships
_CC Agenda 2008 1103
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2008\Packet 2008 1103
Reso 2008-137
(Reference)
Path:
\City Clerk\City Council\Resolutions\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Alternative 3 -Replace the existing PSBs with ahigh-rate clarification process like Actiflo to handle <br />peak wet weather flows. <br />• Alternative 4 -Abandon the existing PSBs and provide chemically enhanced primary treatment <br />(CEPT) for the two existing primary clarifiers. <br />The alternatives will be evaluated and compared based on site layout requirements, process performance <br />and reliability, operation and maintenance considerations, materials of construction, constructability, <br />chemical requirements, and cost. <br />Information and/or Services Provided by City: <br />• Available record drawings and specifications of past WPCP designs. <br />• Input on operation and maintenance requirements of existing primary sedimentation and <br />clarification processes. <br />• Input on configuration of predesign alternatives. <br />Consultant Deliverables: <br />• Figures showing site layout options. <br />• Summary table of altematives comparison. <br />• Summary table of cost of al#ernatives. <br />• Draft TM (5 hard copies). <br />Task 1.9 -Secondary Treatment Process Evaluation. Consultant shall prepare a TM to evaluate the <br />secondary treatment process improvements. Alternatives to be evaluated include, <br />• Altemative 1 -Rehabilitate the existing fixed film reactor (FFR) and provide a second FFR. <br />• Alternative 2 -Rehabilitate the existing FFR and provide new aeration tank(s) that will incorporate a <br />mixed-use process that can enable the new aeration tank(s) to operate as either conventional <br />aeration tanks, contact stabilization tanks, or daily diurnal flow equalization tanks. <br />• Altemative 3 -Abandon the existing FFR and provide new aeration tank(s) that will incorporate the <br />moving bed biofilm reactor (MBBR) process. <br />Consulting Services Agreement between Project No. 08-593-52-239 <br />City of San Leandro and Carollo Engineers, Inc. Page 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.