Laserfiche WebLink
• New structures will not require pile-supported foundations. <br />• Concrete coring and testing is not required for existing structures. <br />• Final design is based on one construction project. <br />• LEED Registration/Certification of the project (including the Administration Control Building) is not <br />included. <br />• Evaluation of new and/or substantially changed design concepts developed and agreed to as part <br />of the predesign and final design peer review process is not included. <br />• Construction management and engineering services during construction are not included. <br />Consulting Services Agreement between Project No. 08-593-52-239 <br />City of San Leandro and Carollo Engineers, Inc. Page 34 <br />