Laserfiche WebLink
• Summary table of proposed MBBR design criteria and anticipated process performance. <br />• Draft pilot study report (5 copies). <br />Task B -Geologic Hazards and Seismic Response Study. If the initial geotechnical investigation at the <br />WPCP site determines that a geologic hazards and seismic response study is necessary, Fugro shall <br />perform the study and provide a smoothed, elastic horizontal site-specific design response spectrum for <br />use by the Consultant in the seismic design of the new facilities. <br />Information and/or Services Provided by City: <br />• None. <br />Consultant Deliverables: <br />• Site-specific design response spectrum. <br />Task C -Effluent Screen Assessment. Consultant shall perform a preliminary assessment of the type of <br />effluent screen alternatives available to remove floating residual materials (snail and nuisance floatable <br />materials) in the chlorine contact tank. <br />Information and/or Services Provided by City: <br />• Input on type of floating residual materials encountered at the plant. <br />Consultant Deliverables: <br />• Description of effluent screen alternatives. <br />Task D -Respond to Predesign Peer Review Comments. If the City decides to hire athird-party <br />consulting firm to perform peer review of the Predesign (nine draft TMs), it is anticipated that the third-party <br />consulting firm will prepare written review comments to the City. Consultant shall then review the written <br />comments and prepare written responses to each comment for review by the City and the third-party <br />consulting firm. For budgeting purposes, 100 Consultant labor hours plus 40 BTA labor hours are assumed <br />for this task. <br />Information and/or Services Provided by City: <br />• Summary table of peer review comments for each draft TM. <br />Consultant Deliverables: <br />• Draft TMs (2 copies for peer reviewer). <br />• Written responses to peer review comments. <br />Key assumptions used in development of this Scope of Services: <br />• Attendance at City Council meetings is not included, <br />Consulting Services Agreement between Project No. 08-593-52-239 <br />City of San Leandro and Carollo Engineers, Inc, Page 33 <br />