My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2008 Carollo Engineers Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2008
>
Agmt 2008 Carollo Engineers Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2008 3:37:41 PM
Creation date
11/18/2008 3:29:58 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/3/2008
Retention
PERM
Document Relationships
_CC Agenda 2008 1103
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2008\Packet 2008 1103
Reso 2008-137
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Input on operation and maintenance requirements of existing primary effluent flow equalization <br />strategy. <br />• 1998 storm 24-hour data. <br />Consultant Deliverables: <br />• Graphs of historical flow data. <br />• Summary table of storage volume requirements. <br />• Summary table of alternatives comparison. <br />• Summary table of cost of alternatives. <br />• Draft TM (5 hard copies). <br />Task 1.11 -Digester 3 Evaluation. Consultant shall prepare a TM to evaluate whether to rehabilitate <br />Digester 3 or replace it with a new digester or another tank configured for another use. As part of this task, <br />Carollo will evaluate anticipated solids production to determine whether Digester 3 is needed for solids <br />treatment. Next, Carollo will rely on the limited condition assessment (concrete coring analysis) performed <br />by others for Digester 3 to estimate the extent of repairs needed in order to assess the cost and <br />constructability of this rehabilitation and compare it to the cost of providing a new tank for use as a digester <br />or another function (i.e. flow equalization) at the same location, <br />Information and/or Services Provided by City: <br />• Available record drawings and specifications of past WPCP designs, <br />• July 2008 Evaluation of Concrete Structures (Final Report). <br />• Input on operation and maintenance requirements of Digester 3. <br />Consultant Deliverables: <br />• Summary table of alternatives comparison. <br />• Summary table of cost of alternatives. <br />• Draft TM (5 hard copies). <br />Task 1.12 -Electrical System Evaluation. Consultant shall prepare a TM to evaluate the key electrical <br />and instrumentation system improvements needed at the plant to support rehabilitation of the WPCP. <br />These include: 1) replacement alternatives for the Pacific Gas & Electric (PG&E) service transformer; 2) <br />Consulting Services Agreement between Project No. 08-593-52-239 <br />City of San Leandro and Carollo Engineers, Inc. Page 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.