My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2008 Carollo Engineers Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2008
>
Agmt 2008 Carollo Engineers Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2008 3:37:41 PM
Creation date
11/18/2008 3:29:58 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/3/2008
Retention
PERM
Document Relationships
_CC Agenda 2008 1103
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2008\Packet 2008 1103
Reso 2008-137
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
replacement of main PG&E service and distribution switchboard; 3) upgrade of electrical service at the <br />existing Administration Control Building; 4) replacement of feeder to all MCCs; 5) replacement of MCCs A, <br />A1, D, E1, F, H, L, R, and S; 6) evaluation of the existing control system's capabilities to accommodate new <br />process requirements; and 7) evaluation of 480V radial and 12KV electrical system. <br />Information and/or Services Provided by City: <br />• Available record drawings and specifications of past WPCP designs. <br />• April 2007 Electrical Upgrade Project Documents (70 Percent Design). <br />• Input on electrical system operation and functionality. <br />Consultant Deliverables: <br />• Figure showing proposed electrical one line diagram. <br />• Figure showing proposed electrical site layout plan. <br />• Summary table of alternatives comparison. <br />• Summary table of cost of alternatives. <br />• Draft TM (5 hard copies). <br />Task 1.13 -Administration Control Building Evaluation. Burks Toma Architects (BTA), a subconsultant <br />to Carollo, shall prepare a TM to evaluate improvements necessary for the Administration Control Building <br />to add additional space for record storage, office space, library rooms, and laboratory. Modifications to the <br />existing locker rooms and restrooms to bring them into compliance with current ADA requirements will also <br />be evaluated. Building addition alternatives to be evaluated include: <br />• Alternative 1 -Provide additional space via cone-story 4,000 square feet expansion to the south of <br />the existing building. The existing building interior will be reorganized to expand the laboratory and <br />provide office and library space. The expansion will incorporate additional office space, a new <br />entry, and new accessible restrooms and locker facilities. <br />• Alternative 2 -Provide additional space via cone-story 4,000 square feet expansion to the east <br />and west of the existing building. Similar to Altemative 1, the existing building interior will be <br />reorganized to expand the laboratory and provide office and library space. The expansion will <br />incorporate additional office space, a new entry, and new accessible restrooms and locker <br />facilities. <br />Consulting Services Agreement between Project No. 08-593-52-239 <br />City of San Leandro and Carollo Engineers, Inc. Page 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.