Laserfiche WebLink
ENGINEER'S COST OPINION <br />FOR <br />Dog Park Feasibility Study <br />Option #3 - 8" DG Entire Park <br />ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT <br />1 Mobilization 1 LS $30,000.00 $30,000.00 <br />*2 Scrub & Regrade w/ AB Access Road 215 CY $110.00 $23,650.00 <br />**3 Decomposed Granite 5,985 SY $52.00 Sal 1,220.00 <br />4 Install Fencing with Gates 855 LF $42.0(? $35,910.(10 <br />5 Benches with Concrete Pad 8 EA $750.00 $6,000.00 <br />6 Shade Structure Concrete Pad 500 SF $15.00 $7,500.00 <br />7 Shade Structure (Galvanized Steel} 1 EA $22,500.00 $22,SOQ.t.~O <br />8 Message Board (Galvanized Steel) 1 EA 55,700.00 $5,700.(0 <br />9 EBMUD connection 1 LS $16,$13.00 $ ] 6,813.1 t0 <br />10 Water Service Line 225 LF $50.00 $] 1,250.00 <br />11 Backflow Preventer Assembly l EA $2,000.00 $2,000.C~O <br />12 Water Fountain Installation 2 EA $5,000.00 $10,000.(0 <br />13 Pe# Station Trash Receptable l EA $500.00 $500.00 <br />14 French brain 80 LF $40.00 $3,200.00 <br />15 Clearing and Grubing /Rough Grading 1 LS $$,500.00 $8,500.00 <br />16 Fine Grading I LS $5,000.00 $5,000_CD <br />SUBTOTAL CONSTRUCTION $499,743.i~0 <br />Permit Fees, Utility Costs, other Misc Fees (incl. BCDC) .......................... $1,150.00 <br />Contingencies ...........................................,...... Percentage: 25% 124,935. ; 5 <br />benign .................................... ................................................. 30,000.(10 <br />Construction Engineering, Inspection & Admin .......................................... 30,000AO <br />BUDGET INFORMATION Account Number {s} Amount <br />Designated Funds Available: TBD <br />TOTAL FUNDING $0.08 <br />By: Amit Salwan Date Prepared: 19-Au -08 <br />Cost Estimate Purpose: Conce l <br />Reviewed: Date: <br />Austine Osakwe, P.E., Senior Engineer <br />Approved: Date: <br />Kenneth Joseph, P,E., City Engineer <br />eer's Cost Estimxe_DG-lU.xls 1012/2(1(1$ <br />