Laserfiche WebLink
ENGINEER'S COST OPINION <br />FOR <br />Dog Park Feasibility Study <br />Option #2 - 4" DG Entire Park <br />ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT <br />f Mobilisation 1 LS $30,000.00 $30,000.00 <br />*2 Scrub & Regrade w/ AB Access Road 215 CY $110.00 $23,650.00 <br />**3 Decomposed Granite 5,985 5Y $26.00 $155,610.00 <br />4 Install Fencing with Gates 855 LF $d2.00 $35,91D.00 <br />5 Benches with Concrete Pad 8 EA $750.00 $6,0(10.00 <br />b Shade Structure Concrete Pad 500 SF $15.00 $7,SOO.C~} <br />7 Shade Structure (Galvanized Steel) 1 EA $22,500.00 $22,500.t~0 <br />8 Message Board (Galvanized Steel} 1 EA $5,700.00 $5,704.t:~D <br />9 EBMUD connection 1 LS $16,813.00 $16,813.ti0 <br />10 Water Service Linc 225 LF $50.00 $11,250.{ ~0 <br />11 Backflow Preventer Assembly 1 EA $2,000.00 $2,000.t?0 <br />1Z Water Fountain Installation 2 IrA $5,000.00 $IO,000.iiO <br />13 Pet Station Trash Receptable 1 EA $500.00 $SOO.t"+0 <br />14 French Drain 80 LF $40.0!} $3,200.ii0 <br />15 Clearing and Grubing !Rough Grading 1 LS $8,500.04 $8,500.(+0 <br />16 Fine Grading 1 LS $5,004.00 $5,4t?0.00 <br />SUBTOTAL CON5TRUCTION $344,133.[+0 <br />Permit Fees, Utility Casts, ether Misc Fees (incl. BCDC}.......................... $1,150.010 <br />Contingencies .................................................. Percentage; ZS% $6,033.25 <br />Design ..................................................................................... 30,0{8}.010 <br />Construction En~ineerin~, ]nsvection & Admin .......................................... 30,004.D0 <br />BUDGET INFORMATION Account Number (s Amount <br />Designated Funds Available: TI3D <br />TOTAL FUNDING 54,40 <br />By: Amit Salwan Date Prepared: l9-Au -08 <br />Cost Estimate Purpose: Cone foal <br />Reviewed: Date: <br />Austine Osakwe, P.E., Senior Engineer <br />Approved: __ Date: <br />Kenneth Joseph, P.E., City Engineer <br />u-rsC~F.U;mue [Ni.lO.xts 10~212(H18 <br />