Laserfiche WebLink
i) Final Plans, specifications, and narrative (if not included in plans and <br />specifications) documenting compliance with the Bay-Friendly Landscaping <br />measures being implemented listed in Appendix C. <br />ii) A preconstruction meeting with the Authority's Bay-Friendly technical assistance <br />contractor has occurred with the landscape construction firm prior to the <br />construction of the landscape to review the Bay-Friendly landscape measures <br />being implemented in this project. <br />iii) Bay-Friendly Landscaping Program Manager and or her designee has <br />conducted a site visit after the construction of the landscape. <br />iv) An electronic copy of the Final Bay-Friendly Scorecard based upon the <br />completed landscape. The Bay-Friendly Scorecard must meet all the <br />requirements and minimum score or better and accurately reflect the built <br />landscape. <br />v) ABay-Friendly Landscaping Maintenance Manual for the Senior Center has <br />been submitted and Bay-Landscaping Education Signage has been installed. <br />vi) A PDF of the landscape planting plans. <br />vii) A completed Bay-Friendly Landscaping Grant Evaluation Form. <br />viii) Grantee submits signed invoice for payment. <br />ACWMA Grant Agreement Page 13 of 14 <br />San Leandro Senior Center (COSL Project 210-18-116) <br />