My WebLink
|
Help
|
About
|
Sign Out
Home
RDA Agmt 2004 Manwaring_Michael
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2004
>
RDA Agmt 2004 Manwaring_Michael
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2009 9:39:38 AM
Creation date
1/26/2009 1:08:57 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
4/12/2004
Retention
PERM
Document Relationships
RDA Reso 2004-003
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />I Scope of Work <br />A Construction Documents <br />1 Prepare location plan <br />2 Prepare Design Intent construction documents, fully detailed for bid and <br />implementation, including technical specifications and drawings as required to <br />convey the design intent <br />3 Prepare final statement of probable construction costs <br />4 Coordinate with the West Estudillo design team on construction drawings <br />5 Review and comment on signage contractor pre-qualification questionnaire prepared <br />by City staff <br />6 Respond to requests for bid information <br />? Prepare addendum to bid package if required to clarify design intent <br />8 Review competitive bids with City and make recommendations <br />9 One (1) review meeting with the City <br />Deliverables <br />One (1) 11"X17" Documentation/Specifications set, plus a digital disk. <br />B Construction Administration <br />1 Provide clarifications to construction documents <br />2 Review submittals (2 rounds, maximum) <br />3 One (1) punch list inspection at site <br />III Assumptions & Conditions <br />A This work is scheduled to commence immediately, with all scope items and processes <br />listed above handled as a single, continuous project. <br />B Construction Documents will be packaged for one (1) phase of implementation by two <br />(2) contractors maximum. <br />C An electronic site plan of the site is to be provided for our use in AutoCAD DWG <br />format by the City. This site plan will be provided to us with all external file references <br />bound to the parent document, with all unnecessary layers removed from the file (as <br />defined by Ellipsis...). <br />Consulting Services Agreement between April 12, 2004 <br />Redevelopment Agency of the City of San Leandro and Michael Manwaring History Walk Phase II <br />Page 15 of 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.