My WebLink
|
Help
|
About
|
Sign Out
Home
RDA Agmt 2004 Manwaring_Michael
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2004
>
RDA Agmt 2004 Manwaring_Michael
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2009 9:39:38 AM
Creation date
1/26/2009 1:08:57 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
4/12/2004
Retention
PERM
Document Relationships
RDA Reso 2004-003
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D The formal Request for Proposal for construction is to be prepared, duplicated, <br />assembled and issued by the City. <br />IV General Exclusions <br />A The design and construction of the wall structure for the History Wall is by others, and is <br />specifically excluded from this scope of work. We will coordinate with and provide <br />direction to the designer of the wall structure in order to provide adequate structure and <br />forms for mounting the signage elements. City to provide or arrange to provide <br />AutoCAD DWG format files for our use in this effort. <br />B Additional reviews which are required due to the contractor's inability to provide <br />acceptable submittals, color, prototype, etc., will be billed to you as additional services, <br />on a time and materials basis. We strongly suggest that these fees be back-charged to the <br />contractor, and that this is clearly defined in your contract with the contractor. <br />C Mock-ups or prototypes are not a part of this proposal (included in fabrication budget). <br />D Engineering and lighting design are specifically excluded from this proposal. <br />E Presentations and hearings for permit or variance, and to commissions, review <br />committees, public groups, etc. are not included in this proposal, and will be billed to <br />you as additional services, on a time and materials basis. <br />V Construction Administration Exclusions <br />A The following Construction Administration tasks are specifically excluded from this <br />Proposal: <br />1 Construction kick-off meeting <br />2 Coordination of manufacturing schedule <br />3 Status reports to client and design team <br />4 Monitoring manufacturing process <br />5 In-shop progress reviews (quality control) <br />6 Pre-installation walk-through at site <br />7 Final inspection at site <br />Consulting Services Agreement between April 12, 2004 <br />Redevelopment Agency of the City of San Leandro and Michael Manwaring History Walk Phase II <br />Page 16 of 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.