My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2009 0217
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2009
>
Packet 2009 0217
>
8E Consent 2009 0217
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2009 10:04:52 AM
Creation date
2/13/2009 10:04:52 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
2/17/2009
Retention
PERM
Document Relationships
_CC Agenda 2009 0217
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2009\Packet 2009 0217
Reso 2009-024
(Reference)
Path:
\City Clerk\City Council\Resolutions\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Applicable General Plan Policy <br />• Policy 50.01--Access to senior services should be improved through planning, advocacy, and <br />the use of City resources to address identified needs <br />• Action 5.01-A Develop a senior center interconnect <br />Permits and/or Variances Granted <br />• This project is consistent with zoning for the area as well as the East 14th Street South Area <br />Development Strategy <br />Environmental Review <br />• The project is categorically exempt <br />Code Compliance Review <br />• A City of San Leandro Building Permit was obtained for this work <br />• An Encroachment Permit was obtained for work on East 14th Street within the Caltrans <br />right-of--way <br />• A permit has been obtained from the Alameda County Flood Control for connection to its <br />storm drain <br />Board/Commission Findings <br />• The Senior Commission provided input on the conceptual design and will continue to <br />participate as the project progresses <br />• A general update on this project was given to the Redevelopment Agency Joint Project Area <br />(JPA) RAC on November ] 5, 2006 <br />Summary of Public Outreach Efforts <br />• Two community meetings were held as part of the needs assessment and conceptual design <br />phase; input was solicited on site selection and building/program features <br />• No further public meetings are anticipated <br />Fiscal Impact <br />• A summary of the construction contract for the Phase 1 parking lot construction is listed <br />below: <br />O.C. Jones and Sons Original Contract $1,557,000 <br />422 Whitney Street Change Orders $390,000 <br />San Leandro, CA 94577 Total Contract Amount $1,947,000 <br />• Major Contract Change Order items include modifications to 138thBast 14th Street <br />intersection for the 9th Grade Campus and landfill disposal of Class 2 soil <br />
The URL can be used to link to this page
Your browser does not support the video tag.