Laserfiche WebLink
Applicable General Plan Policy <br />• Policy 50.01--Access to senior services should be improved through planning, advocacy, and <br />the use of City resources to address identified needs <br />• Action 5.01-A Develop a senior center interconnect <br />Permits and/or Variances Granted <br />• This project is consistent with zoning for the area as well as the East 14th Street South Area <br />Development Strategy <br />Environmental Review <br />• The project is categorically exempt <br />Code Compliance Review <br />• A City of San Leandro Building Permit was obtained for this work <br />• An Encroachment Permit was obtained for work on East 14th Street within the Caltrans <br />right-of--way <br />• A permit has been obtained from the Alameda County Flood Control for connection to its <br />storm drain <br />Board/Commission Findings <br />• The Senior Commission provided input on the conceptual design and will continue to <br />participate as the project progresses <br />• A general update on this project was given to the Redevelopment Agency Joint Project Area <br />(JPA) RAC on November ] 5, 2006 <br />Summary of Public Outreach Efforts <br />• Two community meetings were held as part of the needs assessment and conceptual design <br />phase; input was solicited on site selection and building/program features <br />• No further public meetings are anticipated <br />Fiscal Impact <br />• A summary of the construction contract for the Phase 1 parking lot construction is listed <br />below: <br />O.C. Jones and Sons Original Contract $1,557,000 <br />422 Whitney Street Change Orders $390,000 <br />San Leandro, CA 94577 Total Contract Amount $1,947,000 <br />• Major Contract Change Order items include modifications to 138thBast 14th Street <br />intersection for the 9th Grade Campus and landfill disposal of Class 2 soil <br />