My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2009 Brown & Caldwell
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2009
>
Agmt 2009 Brown & Caldwell
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2009 4:12:55 PM
Creation date
2/20/2009 4:10:36 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
2/17/2009
Retention
PERM
Document Relationships
Reso 2009-026
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
necessary (56 billable hours). This task includes a total of 3 change orders will <br />be processed. The City will be responsible for processing change orders with the <br />Contractor. The Consultant will also assist the City with claims assistance. <br />Consultant agrees that if a design error falls outside a reasonable interpretation of <br />the Standard of Performance, Consultant shall prepare specifications and <br />drawings for the change order that is a result of that design error at no extra cost <br />to the city and this change order shall not count towards the 3 change orders in <br />this task. <br />f. Special Inspections: This task includes special inspections by the Consultants <br />structural engineer and special inspector as listed on plan drawing 698 - "General <br />Structural Notes" (82 billable hours). Special inspections shall include all <br />structural concrete, reinforcing steel, all field and shop welding, and bolts <br />installed in concrete, all epoxy anchors, wedge anchors, and anchor bolts. The <br />Consultant will prepare a site visit memorandum for each of the site visits. This <br />task includes 8 visits for the Consultants structural engineer and 8 site visits for <br />the special inspector. The Consultant shall contract with Kleinfelder or SCL if <br />their special inspector is not available and the City shall give a 48 hour notice for <br />all special inspections. The Consultant shall provide a letter at the end of the <br />project acknowledging the special inspections are acceptable per Exhibit E. <br />g. Site Visits/Meetings: This task includes site visits/meetings by the Consultants <br />personal to clarify questions for the Contractor and the City. This task includes <br />12 site visits (54 billable hours). The Consultant will prepare a site visit <br />memorandum for each site visit for the City's records. This task does not include <br />attendance of weekly progress or construction meetings. <br />h. Startup Assistance: The Consultant will assist the City with startup of the WAS <br />pumps, polymer blend system, and new solids thickening system (30 billable <br />hours). This task assumes that the City does not need startup assistance with the <br />existing system. The Consultant will review the Contractor's startup plans before <br />the startup site visits. This task assumes 3 site visits for startup assistance will be <br />required. <br />i. Record Drawing Preparation: The Consultant will create record drawings and <br />specifications from the Contractor and City markups (68 billable hours). <br />j. Project Management: This task will include project management, monthly <br />progress reports, and preparation of monthly invoices (44 billable hours). <br />Consulting Services Agreement between 08-593-52-230 <br />City of San Leandro and Brown and Caldwell--Exhibit A Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.