Laserfiche WebLink
conditions. In addition, apartments will also face inwards on all sides, fully wrapping an internal podium- <br />level landscaped courtyard. <br />The podium will contain well landscaped outdoor areas, including a central raised landscaped feature, a <br />children's play area, and community patio adjacent to the community room. Also accessible at the <br />podium level will be amulti-purpose community club room with kitchen that will be available for <br />resident use, community functions and used to deliver resident services and after school programs. <br />Laundry rooms will be conveniently provided on every floor adjacent to the elevator lobby. <br />A 10 foot deep, heavily landscaped, setback will be provided along Martinez Street. A community <br />garden with individual private gardens for the residents will be located on the west side of the building <br />within the setback area. These community gardens will provide an opportunity for residents to grow fresh <br />herbs and vegetables. This area will also include a small community gathering area as well as a <br />landscaped bio-swale to handle site drainage. <br />The outdoor space to the north (between the building and the paseo) will contain a play area and outdoor <br />space as required should a child care facility operate within the community program space on the ground <br />level. <br />David Baker and Partners, a nationally recognized and acclaimed architectural firm, has designed <br />Cannery Court. The modern industrial style reflects the industrial history of the site and surrounding <br />properties while referencing other community residential themes. The design, with varying building <br />heights, multiple colors and building materials, and differing roof lines, gives the project a village feel <br />and helps define the area architecturally. <br />There will be a cross access easement provided to and from the Replacement Parking Garage owner to <br />allow full access to the entry driveway and fire access lane. The City of San Leandro will also either <br />vacate or dedicate a portion of land adjacent to Alvarado Street to San Leandro Crossings West to allow <br />fire truck access to the northwest comer of the building. <br />Schools <br />In January 2008, the San Leandro Unified School District issued a report titled, "2008 Developer Fee <br />Justification Study." Pursuant to California Education Code Section 17620, the school district is allowed <br />to assess fees on new residential construction to fund the construction of new school facilities. The school <br />district hired a consultant (SchoolWorks) to review demographic trends in the school district and develop <br />a justification for the fee the school district charges developers for new development. The study found <br />that there currently exists a reasonable relationship between new residential development and the need for <br />additional school facilities in the San Leandro Unified School District. To the extent that this relationship <br />exists as demonstrated in the report, the school district is authorized for levying developer fees as <br />authorized by Education Code Section 17620. In their approval of the new developer fees, the school <br />district made the following findings: <br />" a) the purpose of the fees adopted and confirmed in this resolution is to fund the construction or <br />reconstruction of school facilities; b) these fees will be used to fund the construction or reconstruction of <br />school facilities needed to reduce overcrowding which exists in the District and impairs the normal <br />functioning of educational programs; c) the overcrowding to be reduced by use of these fees exists <br />because the enrollment resulting from continuing residential, commercial, or industrial construction <br />exceeds the capacity of the District to provide adequate housing; d) the amount of fees to be paid pursuant <br />Planning Commission Staff Report January 22, 2009 <br />San Leandro Crossings Public Hearing Page 6 of 12 <br />