Laserfiche WebLink
EXHIBIT B <br />COMPENSATION SCHEDULE <br />1.0 Finalize Construction Documents <br />1.1 Perform Project Management and Administration <br />1.2 Attend Pre-Construction and Other Meetings <br />1.3 Respond to Requests for Information (RFIs) <br />1.4 Clarify the Intent of the Plans And Specifications <br />1.5 Design Support for Construction Change Orders <br />1.6 Review Contractor Initiated Change Orders <br />1.7 Perform Periodic Field Reviews <br />1.8 Provide Materials and Shop Drawing Reviews <br />1.9 Assist City Resident Engineer <br />1.10 Assistance During Project Close-Out <br />1.11 Prepare As-Built Plans <br />1.12 Sub-consultant Support <br />2.0 Perform Construction Staking <br />3.0 Reimbursable Expense limit <br />TOTAL <br />HOURLY FEES <br />$ 3,535 <br />$ 3,920 <br />$ 7,884 <br />$ 9,652 <br />$ 2,248 <br />$ 8,724 <br />$ 8,046 <br />$ 3,792 <br />$11,058 <br />$ 5,516 <br />$ 1,738 <br />$ 3,598 <br />$ 9,444 <br />$21,720 <br />1 000 <br />$101,875 <br />Princi al $290/hour <br />Pro~ect Mana er $255/hour <br />Structure Desi n $172/hour <br />Desi n En ineer $135/hour <br />Structure Desi n Su ort $105/hour <br />Draftin Su ort $85/hour <br />Admin Su ort $70/hour <br />Surve Mana er $150/hour <br />Office Surve or $160/hour <br />Construction Stakin $215/hour <br />Consulting Services Agreement between 08-144-39-012 <br />City of San Leandro and Mark Thomas and Company, Inc.--Exhibit B Page 17 <br />