Laserfiche WebLink
~®~'i1~3~~te ~1~~ ~~ ~~~ ~'~J ~~~5 <br />Council Council Project Project ~-fie ~~ag- _2oxa ~t,rrin~~ry ~ s~~5cri~tx~~ <br />l~anling Average ~Tu,ZZ~er ~tee~ng <br />{1-xo; Con~~~~it~Yee <br />_ Adjusted <br /> R~r~ling <br />3 7.86 2009-2010 ADA 2oog.o23o R 7 Replace or install approximately igo ADA pedestrian ramps in locations <br />Ramp Project throughout the City <br />19 5.14 Senior Center E®C 2004.0212 $ 8 Provide for back-up data servers, EOC supplies, computers and telephones <br />Supplies and for the new building <br />Computer Equipment <br />8 b.57 Storm Drain System 2008.0140 D g Inventory the City's storm drain system, prepare updated storm drain maps <br />Inventory and in the ~GIS system and assess condition of all pipes and structures <br />Inspection <br />17 5.71 Sidewalk Repair City 2006.0120 R 1o Allocation of funds to repair sidewalk in along City owned property frontages <br />Properties (annual) as determined by sidewalk inspections <br />Shoreline Riprap 2006.0110 M 11 As part of the Heron Bay Assessment District Maintenance Area -Annual <br />Construction (annual) allocation for repair and construction of banks along the Shoreline Trail and <br /> areas south from the Neptune Drive Bridge to the San Lorenzo Creek <br />g x•43 East 14th Street 2005.0100 R 12 The proposed projects consist of Phase I streetscape improvements along the <br />South Area section of East 14th Street from 136th to 145th Avenues. Proposed <br />Revitalization Project improvements would consist of widening sidewalks with bulb-outs, <br />, <br />Phase I enhancing crosswalks, and new street trees <br /> <br />Tuesday, March ro, 2oog Page 2 of ~.g <br />