Laserfiche WebLink
<br />P~l"~ i+ ,r -~ ~ d ,-^~ ~, s -v <br />~'0~~~c;1 Ct~u~~cil 1'rc3 .,~t Projec~~ ty-~e 2oc~c~~oio Su~~n~ary Lescri.E~stioP <br />FCai~ling ,:average `vTurni~~r Steering <br />t~-lo) Cc~r~~mitfee <br />Adjusfeci <br />Rat3hing <br />- <br />36 3.86 Toyon Park Play 2oo8.oioo P 25 Put play equipment into the empty play area <br />equipment <br />q. 6.86 Marina Park - group 2005.0040 P 26 Design and rebuild the three group picnic areas at Marina Park to provide <br />P1Cn1C Areas shade and a wind barrier. The existing revenue generating facilities have been <br /> damaged by age and dry rot and had to be partially removed leaving an <br /> attractive naisance. <br />~aS~lington Man®r 20®3.©i']o P 2'] This project w~11 replace play equipment to meet ADA standards and install <br />Park Playground new eurbing and surfacing. <br />Renovation <br />3® 4.43 Stenzel Park Drainage 2003.0']20 P 28 This project includes installation. of sand drains in the outfield areas of Field <br />Project #~ of Stenzel Park. <br />Thrasher Park Field 2003•®720 P 2g This project includes corrects drainage problems throughout the outfield area <br />Drainage of the field at Thrasher Park. <br />6 6.~1 Downtown '~®D park 2oog.®~ 3o P 3o Phase i -Master plan to study Land acquisition and development of a new <br />development -Master park in the downtown TOD project area. No acquisition or construction in <br />Plan this phase <br />Page 5 of 19 <br />Tuesday, March lo, 2009 <br />