Laserfiche WebLink
~~~~~~e~e ~.~~t ~~ ~~~' ~~~;~e~~8 <br />~OUi1C11 COl1Ii:ll PiO7eCt ~~TC)?eC' ~ j~P `~~~~201E? ~ill?irT'caTV Dc ~Ci'~3$lOil <br />Rarll~ng Average Number St~~~~s;ng <br />(i-io) C«nlmittee <br /> -~ditl~=ied <br /> <br />Toyon Park 2003.0400 P 31 Replace play equipment to meet ADA standards and instaIl new surfacing <br />Playground after the school construction is completed. <br />Renovation & <br />Irrigation <br />21 5.00 San Leandro Family 2008.01'70 P 32 Construct a 25 yard by 25 meter pool at the Aquatics Center including <br />Aquatics Center additional parking as previously designed. Project added at i/3/08 CIP <br />COmpe$ltlOn Pool Committee Meeting <br />dart Area Station and 20®3.0290 R 33 Proposed improvements will include new landscape medians, streetlights and <br />Streetseape trees, and re-striping on San Leandro Bo,zlevard in front of the BART <br />Phase <br />Improvements Station. New streetlights, trees, and bulb-outs on West Estudillo Ave were <br />, funded in 02/03. <br />II <br />34 4.00 Siempre Verde Park - 2®05•®®5o P 34 Replace t_he playground equipment and renovate the picnic area at Siempre <br />Playgrov nd Verde Park with new equipment that provide play value and meets current <br />E ui ment <br />q p code requirements. Renovate the picnic area to modernize and make more <br />i <br />~ <br /> ve. <br />at <br />~aet <br />North Area Storm 2005.00'70 D 35 1?esign of storm drain improvements to releav° gutter flaw on Juana and <br />Drainage Joaquin between Bancroft and San Jose per the North Area Storm I?rain <br />Improvements Study <br />Tree Well Repair 200~.004o R 36 Repair and/or replace tree damaged pavers/grates/concrete at various <br />Program locations within the Joint P.edevelopment Area <br />~, Page 6 of i9 <br />'T'uesday, Marc~r lo, 2009 <br />