Laserfiche WebLink
CrWbA3—ZM­f�-IBf4-AiF\�� 66—DE <br />6, Chapter 4 <br />FEES. The follovAng fees have been established by the City Council pursuant to various <br />Heating, Ventilating and Air Condition or Gener <br />furnace, each <br />each <br />Minimum (one or two flues) <br />Minimum (one or two systems) <br />,jen cal: <br />Incinerators — domestic, each <br />Garbage chutes, each <br />Fire dampers, each <br />trof Wier t; i7 commerciatfind <br />To 3 h.lpeach <br />ea - <br />100,000 BTU <br />are <br />'Industrial Processing Equipment: <br />dryers, cookers, fryers, kettles, etc. each <br />�industrial processing exhaust systems, each system <br />'Manufactured spray booths, each <br />aii�n'--r—e"v"Tiew of plans and/or energy forms for all buildings <br />�sulbject to the California Energy Commission's conservation regulations (when <br />(1) Direct Cost= hourly personnel charge plus a factor of 100% for fringe be <br />wisions of the San Leandro Municipal Code (SLMC). San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />Current Fee Proposed Fees 2009- 10 <br />521.35 <br />CP13.11%-$22.00 <br />Direct Cost (1) Wth a minimum charge of $54.0 <br />s, overhead and Indirect costs <br />