Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
E FINANCE <br />TLE 6 Chapter 4 FEES ..... ..... -"-, . .... . ...... . . __ ........ . . . ...... ..... . ........ . . ..... <br />...... . ..... . . <br />--- - ------ <br />FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLIVIC), San Leandro Administrative Code (SLAC) or the general laws of the State of California <br />. . . . ... ..... . .......... . .. ...... . ............. ... ...... .. . . . . .. .... ............ .. ... ... . ... <br />. . ......... .... <br />Descr hon Current Fee Aeferenoe <br />. ....... <br />Proposed Feea 2009 10-. <br />-- ----- .. .... . .. .. ...... ......... <br />Mimmum Fee 2.00 PLUS the fees shove in the tae schetlule as <br />a ��_ � .P- __. <br />`adopted by the City Council except that wherever an <br />houdy rate Is shown, the rate shall be equal to the Direct <br />0� �ers greater. <br />rj <br />!Plan Checking 162.00 PLUS the fees shown In the fee schedule as <br />adopted by the City Council except that wherever an <br />.`-howdy rate is shown, the rate shall be equal to the Direct <br />........ .. Cost (1) or whichever is greater. <br />CPI 3. 11 %1$63.95 <br />. ........... <br />;Miscellaneous <br />- — ---------.......... . ..... <br />A. Inspection Fees <br />Fees or Inspection not otherwise set forth herein -Direct Cost (1) <br />, _C0W;WY kiiiii"O"On it"i Dk*d4Q fl) wW <br />New Fee <br />Fees for inspection conducted outside of i7noal=usinessihouRate equal to 1.5 times the Direct Cost (1) Wth a <br />1`9e of two 2 hours ... . . .... ... .... .. ......... <br />. ... ...... ... ....... ..... . ... ..... <br />. .... . ...... . ... <br />B. Extra Inspection Fees <br />(1 ) Deficient or defective work, or otherwise through fault or error :One inspection made under the regular fees as <br />on the art of the holder of ertnil or his/her em to ees rowded herein <br />- <br />Each and every further extra inspection visit i Direct Cost (1) with a minimum of one hour <br />(2) Incorrect Address or location of hour <br />(3) Amending application to increase the number of devices `Fees as stated herein for additional installations <br />authorized for installation or repair after permit has been issued <br />and before apyins jp.e�tLoa o is n�ade.'_ . ............ ... . ....... ... .... ...... <br />—obtaining <br />. .......... <br />— -- - --­------- - -- — --------- <br />(4) Investigation fee for work commenced without first 7Fee equal Cc��h'nW�C37)times the minimum fees <br />permits as required by the San Leandro Municipal Code, whether 'PLUS any required permit fee <br />or nota permit is subsequent issued. <br />(5) GcWe Lank a NtspeGbo tg at1e n6 quest M the prtlp arty OtreCt Cwt (1j wph a mintmum 47I arta troch <br />New Fee <br />New F <br />Note: Payment of any investigation fees does not exempt any person from <br />�compliance with all other provisions of applicable codes in the execution of the <br />,work nor 9,riyRth�arp n�aft�.s aw- <br />a� _pr� eq�y_L__ ........ . ... . ....... <br />C. Other Fees and Charges <br />......... .. ... <br />.... <br />'Automation Update Fee '5% of Permit Fee, Minimum $5.40 permit type <br />. ... .............. -- <br />CPI 3.11%1$5.60 <br />,StrongMotion Impact : State mandated tax for the Seismic Safety <br />New Fee <br />Residential., .0010 per $10.00 Valuation or fraction thereof with a <br />Commission for seismic monitoring. Collected for the State by the City. <br />$0.50 min. Commerical.,17ndustrial:.0021 per <br />$10.00 Valuation or fraction thereof with a $0.50 min. <br />I LIIWWo iiandardFs—Commission (SB1473) Fee: State Mandated tax for <br />New Fee <br />..... .. ....... . <br />All Residential, Commercial, and Industrial permits that use <br />Green Bufdling Standards collected for the State by the City. <br />Valuation to determine permit fees. $1.00 per $25,000 valuation <br />or fraction thereof with a $1.00 minimum. <br />. . ...... ..... . ........ . ... . ... ...... . . m.. ............ . . . . . ............. <br />Certificate of Occupancy Direct Costs (1) vAth minimum of $127.00 <br />. . .. . ...... . . .. . .... . .. ....... ... .... ......... ...... <br />CPI 3. 11 YW$131 <br />. ..... . . ......... . ..... <br />_;iii—Y15�to Of &.ruP_o Direct Costs (1) vAth minimum of $127.00 <br />Change <br />I'&r irtica—t(i�.ofC—orrrpCii�n—ce—: Orw C4W *fth of $127 <br />CPI 3. 11 %1$131 <br />New Fee <br />.Single family dwelling I minimum of $127.00 ....... <br />.. . .... CPI 3,1191.1$131 <br />.... <br />. . <br />��midw n_g'___­­`­­_­­_ 'Direct Costs (1) with minimum ­of"JIL7.. <br />.. . .. .. ­ <br />CPI 3.11%1$131 <br />11 others Direct Costs (1) with minimum of $127.00 <br />CPI 3.117./$131 <br />,House Moving Permit -Direct Costs (1) plus mileage, with minimum of <br />127 0 <br />Clot 3,11511$131 <br />�File retrieval and refiling (no staff assistance) . . ......... .. .. . .. __ ... . . .. ...... <br />Microfilm Copies . .. . . .... . 05 <br />CPI 3. 11 Y.16.45 <br />. . . . .. . . ...... . <br />t -Staff assistance with file contents <br />Microfilming of Permit and Plans includes im; <br />u oses of fee char es, each ermit is m <br />8-112 x 11 or 11 x 14 drawings including fire I <br />other size drawngs <br />-Appeals <br />1) Direct Cost =hourly personnel charge plus a <br />G:TrF5\2009-10 FeesQ009-10 Proposed Fees <br />-$0.10 per page <br />Costs (1) <br />permits: (For <br />1.75 per sheet <br />costs <br />14 <br />. .... .. . . . . .. . . .. . . . . . <br />4122/200q <br />