<br />PROJECT TITLE: Bay Trail Slough Bridge
<br />PROJECT NO.: 144-39-012
<br />BID NO.: OS-09.016
<br />
<br />This document is a summary of bids received for the subject project and are provided
<br />only as a convenience. Listing of a particular bid is not a finding that such bid has
<br />been found to be responsive or accepted as complete by the City. An award o
<br />contract, if any, is subject to approval of the City Council and/or the City Manager.
<br />Contractors should refer to the contract documents for bidding information.
<br />BID OPENING ENGINEER'S ESTIMATE RGW Construction, Inc. AIS Construction Maggiora & Ghilotti
<br />DATE: Tuesday, April 7, 2009 Date Approved: 2/11/2009 550 Greenville Road 6420 Via Real, Ste. 6 555 Dubois Street
<br />TIME: 3:00 PM Prepared by: JO Livermore, CA 94550 Carpinteria, CA 93013 San Rafael, CA 94901
<br />LOCATION: City Clerk Phone: 925-606-2400 Phone: 805-684-4344 Phone: 415-459-8640
<br /> Fax:925-961-1925 Fax:805-566-6534 Fax: 415-459-2065
<br />ITEM
<br />NO. QUANTITY ITEM UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST
<br />21 13 CY Structure Backfill (Bridge {FQ}) $110.00 $1,430.00 $1,100.00 $14,300.00 $145.00 $1,885.00 $75.00 $975.00
<br />22 6 EA Fumish Pre-stressed Concrete $1,670.00 $10,020.00 $1,700.00 $10,200.00 $2,200.00 $13,200.00 $2,300.00 $13,800.00
<br /> Pile
<br />23 6 EA Drive Pre-Stressed Concrete $2,400.00 $14,400.00 $3,000.00 $98,000.00 $3,700.00 $22,200.00 $3,800.00 $22,800.00
<br /> Pile
<br />24 3 EA Furnish CISS Pile 380,000.00 $240,000.00 $36,000.00 $108,000.00 $33,500.00 $100,500.00 $28,000.00 $84,000.00
<br />25 3 EA Drive CISS Pile $97,000.00 $291,000.00 $130,000.00 $390,000.00 $45,500.00 $136,500.00 $157,000.00 $471,000.00
<br />26 39 CY Structural Concrete (Bridge) $975.00 $38,025.00 $2,300.00 $89,700.00 $1,250.00 $48,750.00 $1,630.00 $63,570,00
<br />27 5,238 LB Bar Reinforcing Steel (Bridge) $2.00 $10,476.00 $2.00 $10,476.00 $1.60 $8,380,80 $1.50 $7,857.00
<br />28 4 EA Furnish Steel Truss $145,000.00 $580,000.00 $86,000.00 $344,000.00 $90,000.00 $360,000.00 $85,000.00 $340,000.00
<br />29 4 EA Erect Steel Truss $14,500.00 $58,000.00 $7,300.00 $29,200.00 $21,075.00 $84,300.00 $20,340.00 $81,360.00
<br />30 60 CY Lightweight Concrete Deck $675.00 $40,500.00 $450.00 $27,000.00 $9,300.00 $78,000.00 $700.00 $42,000.00
<br />31 337 CY Structure Excavation (Soldier $116.00 $39,092.00 $50.00 $16,850.00 $52.00 $17,524.00 $75.00 $25,275.00
<br /> Pile Wall {FQ})
<br />32 337 CY Structure Backfill (Soldier Pile $104.00 $35,048.00 $30.00 $10,110.00 $63.00 $21,231.00 - $75.00 $25,275.00
<br /> . Wall {FQ}}
<br />33 1,654 LF 24" Drilled Hole $50.00 $82,700.00 $52.00 $86,008.00 $36.00 $59,544.00 $26.00 $43,004.00
<br />34 158 CY Concrete Backfill $610.00 $96,380:00 $230.00 $36,340.00 $345.00 $54,510.00 $175.00 $27,650.
<br />35 36 CY Controlled Low Strength $550.00 $19,800.00 $160.00 $5,760.00 $275.00 $9,900.00 $224.00 $8,064.00
<br /> Material
<br />36 2,194 LF Steel Soldier Pile $183.00 $401,502.00 $50.00 $109,700.00 $55.00 $120,670.00 $39:00 $85,566.00
<br />37 60 CY Timber Lagging $1,830.00 $109,800.00 $500.00 $30,000.00 $1,600.00 $96,000.00 $1,130.00 $67,800.00
<br />38 1 LS Clean & Paint Steel Soldier Pile $14,500.00 $14,500.00 $23,000.00 $23,000.00 $24,000.00 $24,000.00 $14,000.00 $14,000.00
<br />39 588 LF Chain-link Fence (4'} $18.00 $10,584.00 $25.00 $14,700.00 $28.00 $16,464.00 $25.50 $14,994.00
<br />TOTAL BASE BID: $2,563,500.00 $1,752,536.10 '" " ~ . 6 ; "' $1,818,818.00
<br />Bid Summary-Bay Trail Slough Bridge (2}.xlsx Page 2 of 15 Printed 4/16/2009 @ 4:18 PM