<br />PROJECT TITLE: Bay Trail Slough Bridge
<br />PROJECT NO.: 144-39-012
<br />BID NO.: 08-09.016
<br />This document is a summary of bids received for the subject project and are provided
<br />only as a convenience. Listing of a particular bid is not a finding that such bid has
<br />been found to be responsive or accepted as complete by the City. An award o
<br />contract, if any, is subject to approval of the City Council and/or the City Manager.
<br />Contractors should refer to the contract documents for bidding information.
<br />BID OPENING
<br />DATE: Tuesday, April 7, 2009
<br />TIME: 3:00 PM
<br />LOCATION: City Clerk ENGINEER'S ESTIMATE
<br />Date Approved: 2/1 i/2009
<br />Prepared by: JO RGW Construction, tnc.
<br />550 Greenville Road -
<br />Livermore, CA 94550
<br />Phone: 925-606-2400
<br />Fax:925-961-1925 AIS Construction
<br />6420 Via Real, Ste. 6
<br />Carpinteria, CA 93013
<br />Phone: 805-684-4344
<br />Fax:805-566-6534 Maggiora & Ghilotti
<br />555 Dubois Street
<br />San Rafael, CA 94901
<br />Phone: 415-459-8640
<br />Fax: 415-459-2065
<br />ITEM
<br />NO. QUANTITY ITEM UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST
<br />1 1 LS Mobilization $233,046.00 $233,046.00 $150,000.00 $150,000.00 $280,000.00 $280,000.00 $149,396.00 $149,396.00
<br />2 1 tS Statonary Mounted Construction $618.00 $618.00 $2;950.00 $2,950.00 $3,900.00 $3,900.00 $3,500.00 $3,500.00
<br /> Area Sign
<br />3 1 LS Roadside Signs $1,800.00 $1,800.00 $500.00 $500.00 $2,800.00 $2,800.00. $2,000.00 $2,000.00
<br />4 989 LF Temporary Silt Fence $7.00 $6,923.00 $1.50 $1,483.50 $3.00 $2,967.00 $6.00 $5,934.00
<br />5 901 LF Temporary Fence $7.00 $6,307.00 $3.00 $2,703.00 $4.00 $3,604.00 $5.00 $4,505.00
<br />6 1 LS Clearing 8 Grubbing $12,000.00 $12,000.00 $16,000.00 $16,000.00 $9,500.00 $9,500.00 $21,700.00 $21,700.00
<br />7 611 LF Remove Chain-Link Fence $5.00 $3,055.00 $3.00 $1,833.00 $3.40 $2,077.40 $6.00 $3,666.00
<br />8 157 LF Remove and Reconstruct Wire $16.00 $2,512.00 $15.00 $2,355.00 $23.00 $3,611.00 $20.00 $3,140.00
<br /> Fence
<br />9 300 SY Temporary Cover $9.00 $2,700.00 $3.00 $900.00 $2.00 $600.00 $3.30 $990.00
<br />10 2 EA Temporary Concrete Washout $3,000.00 $6,000.00 $1,800.00 $3,600.00 $1,700.00 $3,400.00 $2,800.00 $5,600.00
<br />11 224 CY Unclassified Excavation (FQ) $50.00 $11,200.00 $i 00.00 $22,400.00 $15.00 $3,360.00 $86.50 $19,376.00
<br />12 943 CY Imported Borrow (Lightweight $104.00 $98,072.00 $100.00 $94,300.00 $75,00 $70,725.00 $79.00 $74,497.00
<br /> Aggregate}
<br />13 719 TN Aggregates Base $37.00 $26,603.00 $30.00 $21,570.00 $34.00 $24,446.00 $49.00 $35,231.00
<br />14 604 SF Cold Milling $2.00 $1,208.00 $3.00 $1,812.00 $6.00 $3,624.00 $6.00 $3,624.00
<br />15 199 TN Asphalt Concrete $159.00 $31,641.00 $85.00 $16,915.00 $129.00 $25,671.00 $128.00 $25,472.00
<br />16 611 LF Chain-link Fence (6') $21.00 $12,831.00 $16.50 $10,081.50 $19.00 $11,609.00 $17.00 $10,387.00
<br />17 1 EA 16'Chain-IinkGate $2,400.00 $2,400.00 $1,295.00 $1,295.00 $1,475.00 $1,475.00 $1,295.00 $1,295.00
<br />18 6,047 SF Biofiltration Strip $1.00 $6,047.00 $D~:• ~ ~~ 4. ~~~ $5.00 $30,235.00 $1.00 ~ $6,047.00
<br />19 2 EA Removable Bollard $800.00 $1,600.00 $540.00 $1,080.00 $1,100.00 $2,200.00 $534.00 $1,068.00
<br />20 32 CY Structure Excavation (Bridge $115.00 $3,680.00 $800.00 $25,600.00 $91.00 $2,912.00 $75.00 $2,400.00
<br /> {FQ}) ~
<br />Bid Summary -Bay Trail Slough Bridge (2j.xlsx Page 1 of 15 Printed 4/16/2009 ~ 4 18 PM