Laserfiche WebLink
<br />~, O WLER/ -' ~ <br />~.>,.a d1V0 - <br />d'slnKgpm/a T:r~ <br />~;: <br />PROJECT TITLE: Bay Trail Slough Bridge <br />PROJECT NO.: 144-39-012 <br />BID NO.: 08-09.016 <br />This document is a summary of bids received for the subject project and are provided <br />only as a convenience. Listing of a particular bid is not a finding that such bid has <br />been found to be responsive or accepted as complete by the City. An award o <br />contract, if any, is subject to approval of the City Council and/or the City Manager. <br />Contractors should refer to the contract documents for bidding information. <br />BID OPENING <br />DATE: Tuesday, April 7, 2009 <br />TIME: 3:00 PM <br />LOCATION: City Clerk ENGINEER'S ESTIMATE <br />Date Approved: 2/1 i/2009 <br />Prepared by: JO RGW Construction, tnc. <br />550 Greenville Road - <br />Livermore, CA 94550 <br />Phone: 925-606-2400 <br />Fax:925-961-1925 AIS Construction <br />6420 Via Real, Ste. 6 <br />Carpinteria, CA 93013 <br />Phone: 805-684-4344 <br />Fax:805-566-6534 Maggiora & Ghilotti <br />555 Dubois Street <br />San Rafael, CA 94901 <br />Phone: 415-459-8640 <br />Fax: 415-459-2065 <br />ITEM <br />NO. QUANTITY ITEM UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST <br />1 1 LS Mobilization $233,046.00 $233,046.00 $150,000.00 $150,000.00 $280,000.00 $280,000.00 $149,396.00 $149,396.00 <br />2 1 tS Statonary Mounted Construction $618.00 $618.00 $2;950.00 $2,950.00 $3,900.00 $3,900.00 $3,500.00 $3,500.00 <br /> Area Sign <br />3 1 LS Roadside Signs $1,800.00 $1,800.00 $500.00 $500.00 $2,800.00 $2,800.00. $2,000.00 $2,000.00 <br />4 989 LF Temporary Silt Fence $7.00 $6,923.00 $1.50 $1,483.50 $3.00 $2,967.00 $6.00 $5,934.00 <br />5 901 LF Temporary Fence $7.00 $6,307.00 $3.00 $2,703.00 $4.00 $3,604.00 $5.00 $4,505.00 <br />6 1 LS Clearing 8 Grubbing $12,000.00 $12,000.00 $16,000.00 $16,000.00 $9,500.00 $9,500.00 $21,700.00 $21,700.00 <br />7 611 LF Remove Chain-Link Fence $5.00 $3,055.00 $3.00 $1,833.00 $3.40 $2,077.40 $6.00 $3,666.00 <br />8 157 LF Remove and Reconstruct Wire $16.00 $2,512.00 $15.00 $2,355.00 $23.00 $3,611.00 $20.00 $3,140.00 <br /> Fence <br />9 300 SY Temporary Cover $9.00 $2,700.00 $3.00 $900.00 $2.00 $600.00 $3.30 $990.00 <br />10 2 EA Temporary Concrete Washout $3,000.00 $6,000.00 $1,800.00 $3,600.00 $1,700.00 $3,400.00 $2,800.00 $5,600.00 <br />11 224 CY Unclassified Excavation (FQ) $50.00 $11,200.00 $i 00.00 $22,400.00 $15.00 $3,360.00 $86.50 $19,376.00 <br />12 943 CY Imported Borrow (Lightweight $104.00 $98,072.00 $100.00 $94,300.00 $75,00 $70,725.00 $79.00 $74,497.00 <br /> Aggregate} <br />13 719 TN Aggregates Base $37.00 $26,603.00 $30.00 $21,570.00 $34.00 $24,446.00 $49.00 $35,231.00 <br />14 604 SF Cold Milling $2.00 $1,208.00 $3.00 $1,812.00 $6.00 $3,624.00 $6.00 $3,624.00 <br />15 199 TN Asphalt Concrete $159.00 $31,641.00 $85.00 $16,915.00 $129.00 $25,671.00 $128.00 $25,472.00 <br />16 611 LF Chain-link Fence (6') $21.00 $12,831.00 $16.50 $10,081.50 $19.00 $11,609.00 $17.00 $10,387.00 <br />17 1 EA 16'Chain-IinkGate $2,400.00 $2,400.00 $1,295.00 $1,295.00 $1,475.00 $1,475.00 $1,295.00 $1,295.00 <br />18 6,047 SF Biofiltration Strip $1.00 $6,047.00 $D~:• ~ ~~ 4. ~~~ $5.00 $30,235.00 $1.00 ~ $6,047.00 <br />19 2 EA Removable Bollard $800.00 $1,600.00 $540.00 $1,080.00 $1,100.00 $2,200.00 $534.00 $1,068.00 <br />20 32 CY Structure Excavation (Bridge $115.00 $3,680.00 $800.00 $25,600.00 $91.00 $2,912.00 $75.00 $2,400.00 <br /> {FQ}) ~ <br />Bid Summary -Bay Trail Slough Bridge (2j.xlsx Page 1 of 15 Printed 4/16/2009 ~ 4 18 PM <br />