My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2009-058
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2009
>
Reso 2009-058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 10:37:48 AM
Creation date
5/6/2009 4:09:56 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
5/4/2009
Retention
PERM
Document Relationships
3A Public Hearing 2009 0504
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2009\Packet 2009 0504
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN LEANDRO ADMINISTRATIVE CODE <br />FINANCE <br />TITLE B, Chapter 4 <br />FEES <br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />Description <br />Current Fee Reference <br />3 Electrical Permit (Continued) <br />Rectifiers (mercury arc, vibrating and electrolytic): for each kW or kVA and <br />fraction thereof <br />1 to 20 <br />$20.50 <br />21 to 50 <br />$51.00 <br />51 to 80 <br />$78.05 <br />81 and above <br />$91.35 <br />For Inspection of alterations and changes In existing wiring, each Inspection visit $26.55 <br />Photovoltaic Fees do not Include Issuing and Filing Fees, Automation fees, and <br />other mandated fees <br />Photovoltaic - Residential <br />$30.00 (includes over-the-counter plan check) <br />Photovoltaic - Commercial/industrial 0 to 8kw <br />$230.00 (includes 1 hr. structural plan check, 1 hr. <br />electrical plan check and 1 inverter <br />Photovoltaic - Commercial/industrial >8 to 48kw <br />$320.00 (includes 1-1 /2hr. structural plan check, 1 <br />hr. electrical plan check and 1 inverter <br />Photovoltaic - Commercial/industrial >48kw <br />$650.00 (includes 4 hrs. structural plan check, 1 hr. <br />electrical plan check and 1 inverter <br />Each 0 - 8kw P.V. Inverter over 1 <br />$20.00 <br />Each >8 - 48kw P.V. Inverter over 1 <br />$50.00 <br />Each >48kw P.V. Inverter overt <br />$80.00 <br />Energy Conservation: review of plans and/or energy forms for all buildings <br />subject to the California Energy Commission's conservation regulations (when <br />not covered by building permit) <br />Direct Cost (1) with a minimum charge of $57.75 <br />4 A. Filing and Issuance Fee <br />$86.00 plus the amount shown below for each <br />plumbing item <br />B. Plan Check, when applicable <br />Direct Cost (1) <br />Exemption: Inspection of the installation of an earthquake gas shutoff valve <br />$28.00 With No Filing & Issuance Fee <br />For new Residential Construction and additions with valuations over $100,000 <br />including all water piping, gas piping, water heating and plumbing fixtures <br />16% of the building permit fee <br />Plumbing fixture or waste discharge, each <br />$10.65 <br />Plumbing fixture removed and opening sealed, each <br />$6.10 <br />Plumbing fixture reset or set after the completion of the structure to an outlet <br />roughed in prior thereto each <br />$8.00 <br />Repair or alteration of drainage or vent piping, each <br />$12.25 <br />Inside rain leader, each <br />$8.00 <br />Dishwasher - residential, each <br />$8.00 <br />Dishwasher- commercial, each <br />$11.80 <br />Garbage disposal - residential, each <br />$8.00 <br />Garbage disposal - commercial, each <br />$11.40 <br />Grease interceptor, each, up to 150 gal. <br />$8.00 <br />Grease interceptor, each, over 150 gal. <br />$19.15 <br />Industrial waste interceptor (sand, grease, neutralizer and clarifier), each <br />$25.20 <br />Sewage ejector pump - residential, each <br />$17.00 <br />Sewage ejector pump - commercial, each <br />$27.05 <br />Water Piping: <br />Water line and first 10 openings (including water using equipment connected $12.25 <br />thereto <br />Each additional opening <br />$1.60 <br />Installation, replacement or abandonment of water service, each <br />$12.25 <br />Irrigation sprinkler system and first 20 heads <br />$25.20 <br />Each additional head <br />$0.55 <br />(1) Prect Cost - hourly personnel charge plus a factor of 100% for fringe benefits, overhead and Indirect costs <br />GAFEE812000-10 Faaer2000-10 Adopted Fees 0 5/15/2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.