Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE <br />FINANCE <br />TITLE 6, Chapter 4 <br />FEES <br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />Description <br />Current Fee Reference <br />3 Electrical Permit (Continued) <br />Fixed Residential Appliances (connection on new or existing circuits): <br />Electric range, dryer, combination washer and dryer, furnace, water heater, <br />etc. each <br />$9.85 <br />Heaters (air, water and other kinds), furnaces and welding machines: For <br />each DW or kVA and fraction of either. <br />Up to and including 20kW or kVA $20.75 <br />Over 20kW or kVA to and including 50kW or kVA <br />$51.25 <br />Over 50kW or kVA to and including 80 kW or kVA <br />$82.10 <br />Over 80kW or kVA $101.15 <br />Fixed commercial appliances (connection on new or existing circuits) not <br />exosedina 1 HP kW or kVA: <br />Medical/dental equipment, food cabinets, show cases, laundry machines, motion $9.85 <br />picture machines specialty lighting, etc. <br />Fire protection systems, other than smoke detectors <br />$14.35 <br />Smoke detectors <br />$4.25 <br />Motors, including starting and controlling apparatus therefore and wiring between <br />same and motor: <br />Up to and including 1 h.p. <br />$4.15 <br />1.1 h.p. to 10 h.p. <br />$9.85 <br />10.1 h.p. to 13 h.p. <br />$31.35 <br />13.1 h.p. to 16 h.p. <br />$38.25 <br />16.1 h.p. to 19 h.p. <br />$45.70 <br />19.1 h.p. to 22 h.p. <br />$52.85 <br />22.1 h.p. to 25 h.p. <br />$60.00 <br />25.1 h.p. to 28 h.p. <br />$67.20 <br />28.1 h.p. to 31 h.p. <br />$74.35 <br />31.1 h.p. to 34 h.p. <br />$81.95 <br />Above 34.h.p. <br />$82.35 <br />For changes, renewals or replacement of said apparatus, where no changes in <br />wiring are necessary <br />One-half (1/2) of the amount set forth above <br />For motor generator sets, balancer sets, dynamotors and converters, including <br />control apparatus <br />150% of fees set forth above, with a maximum for <br />one such machine of $82.35 <br />Generators, including switchboard and controlling apparatus therefore and wiring <br />between some and generator: for each rated maximum of kW or kVA, and <br />fraction thereof <br />1 to 20 <br />$20.15 <br />21 to 50 <br />$53.10 <br />51 and above <br />$82.35 <br />Transformers and balance coils, when not embodied in or included with <br />apparatus for which fee is herein specifically prescribed: rated for each rated <br />kVA and fraction thereof <br />1 to 20 <br />$20.50 <br />21 to50 <br />$51.00 <br />51 to 80 <br />$81.95 <br />81 and above <br />1$95.85 <br />WFEEW009-10 Feaer2000-10 Adopted Fees 6 6/16/2000 <br />