My WebLink
|
Help
|
About
|
Sign Out
Home
FacilitiesTransportation Highlights 2009 0512
CityHall
>
City Clerk
>
City Council
>
Committees
>
Facilities & Transportation Committee
>
FacilitiesTransportation Highlights 2009 0512
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:58:13 AM
Creation date
5/29/2009 9:59:05 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Committee Highlights
Document Date (6)
5/12/2009
Retention
PERM
Document Relationships
_CC Agenda 2009 0601
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2009\Packet 2009 0601
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Chamber of Commerce space faced with a storefront enclosure to improve <br />Estudillo street view <br />o Open structure promotes surveillance and security, while providing inviting image <br />o Generous stairway, dual elevator with glass fronts <br />o Conduits for future security cameras and sub -outs for future electric powered <br />vehicle charging <br />• Plaza del Oro <br />o Palm tree lined landscaping <br />o Hardscape details to match Plaza improvements on west side of E. 14th Street, <br />providing visual continuity with Downtown <br />o Garage roof storm water runoff will be collected and conveyed to provide <br />irrigation to Plaza Rain Garden, meeting Clean Water requirements <br />o New updated bus shelter structure <br />• LEED Status <br />o LEED certification is generally not achievable for parking structures, but due to <br />inclusion of the Chamber of Commerce office, Silver (and perhaps Gold) level <br />may be possible <br />o LEED application has been submitted to register the project <br />o LEED documentation will continue throughout construction phase <br />• Cost Estimate <br />o 4 -story (370 spaces) $11,700,000 <br />o 5 -story (462 spaces) $13,500,000 <br />o Available budget $12,500,000 <br />o Grant opportunities possible through a Transportation Stimulus grant and through <br />alliance with Better Place for electric vehicle charging stations <br />• Schedule <br />o Call for bids in July 2009 <br />o Award September <br />o Temporary parking lot construction August — September 2009 <br />o Demolition and construction of garage to begin October 2009 <br />o Project completion April 2011 <br />Councilmember Reed asked if parking in the new structure will continue to be free. Ken Joseph <br />stated that the temporary parking (2 -3 hours) would still be free, but there would continue to be <br />a charge for permit parking on the second floor and above. <br />Councilmember Souza inquired about the budget for the Chamber of Commerce office space and <br />what measures would be taken to ensure that the Chamber improvements come in on budget. <br />Ken Joseph stated that the built out allowance for the entire space is $400,000.00 and would be a <br />separate item in the bid documents. Cynthia Battenberg and Luke Sims added that the Chamber <br />personnel have already signed off of the budget for the build out. They added that Business <br />Development is working with the Chamber and presenting choices for the office space that will <br />stay within the built out allowance. <br />4. Discussion Regarding Energy Block Grant <br />Mike Bakaldin gave brief details of an Energy Block Grant that the City will apply for. This <br />grant is in the amount of $732,000.00 and must be used for energy conservation programs. The <br />Facilities and Transportation Committee Page 5 <br />Meeting Highlights 5/12109 <br />
The URL can be used to link to this page
Your browser does not support the video tag.