My WebLink
|
Help
|
About
|
Sign Out
Home
8H Consent 2009 0706
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2009
>
Packet 2009 0706
>
8H Consent 2009 0706
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2009 10:09:16 AM
Creation date
7/6/2009 10:09:11 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/6/2009
Retention
PERM
Document Relationships
_CC Agenda 2009 0706
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2009\Packet 2009 0706
Reso 2009-101
(Reference)
Path:
\City Clerk\City Council\Resolutions\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~'"e~tern Pacific !5'~ignal, LLC <br />15890 Foothill Blvd. • San Leandro, CA 94577 <br />Phone (510) 483-6400 Fax (510) 483-1402 <br />- Detector alarm (malfunction diagnostics) thresholds <br />- Intersection group and flex group definitions <br />Upon review and acceptance by the City, installation of the controller shall be coordinated <br />with the City staff per task #26. <br />Approval of controller units and associated timing sheets for task #14 shall constitute <br />approval for pay item #6 (Exhibit B Compensation schedule), on a per item basis. <br />Task #15: ETHERNET-BASED COMMUNICATIONS TRAINING FOR FIELD DEVICES <br />WPS Staff will provide a comprehensive training course on Ethernet-based communications <br />structure for the ATMS network and field devices utilized on this project. Specifically, the <br />training will focus on the following key course objectives: <br />a. Conversion of fiber optic communications from analog to digital IP <br />b. Cisco Systems fiber hub switch overview and updated fiber routing diagrams <br />c. IP-based subnet definitions utilized within the new ATMS <br />d. ATMS Server "hostname" IP, and security authentication within the Naztec Model <br />980 NEMA TS2 controllers <br />e. EtherWAN edge switch configuration <br />£ Central and field communications diagnostics and troubleshooting strategies. <br />This task will cover both serial and Ethernet based communications and device configuration <br />parameters for the new ATMS. <br />The communications training will allow a unified strategy for tasks #20 (programming <br />EtherWAN edge switch management functions), and task #21 (programming Axis video <br />encoder settings). <br />Task #16 - #19 DELIVERY OF THE ATMS.NOW CENTRAL SERVER <br />WPS will deliver, configure, and install the ATMS.now server, complete with all controllers <br />defined, identified on the City GIS system map, and with local intersection scan screen <br />graphic overlays, capable of displaying real-time color (G-Y-R) status. <br />Consulting Services Agreement between 6 <br />City of San Leandro and Western Pacific Signal, LLC -Exhibit A <br />
The URL can be used to link to this page
Your browser does not support the video tag.