My WebLink
|
Help
|
About
|
Sign Out
Home
8H Consent 2009 0706
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2009
>
Packet 2009 0706
>
8H Consent 2009 0706
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2009 10:09:16 AM
Creation date
7/6/2009 10:09:11 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/6/2009
Retention
PERM
Document Relationships
_CC Agenda 2009 0706
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2009\Packet 2009 0706
Reso 2009-101
(Reference)
Path:
\City Clerk\City Council\Resolutions\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~Ye~atern Pacific Signal, LLC <br />15890 Foothill Blvd. • San Leandro, CA 94577 <br />Phone (510) 483-6400 Fax (510) 483-1402 <br />Task #23: INITIAL FIELD DEPLOYMENT OF CONTROLLER EQUIPMENT <br />WPS will schedule and work with City to deploy a minimum of one full corridor of field <br />controller equipment prior to the next round of controller and ATMS training. This will <br />enable future training sessions to monitor live field equipment. <br />WPS will work with the City to determine the best deployment schedule for the controller <br />upgrade. We recommend an Off-Peak schedule before noon or in the evening after the PM <br />commute. Due to the advance cabinet modifications and controller testing, each intersection <br />should only be in Flash no longer than 10 minutes before normal operation is restored. <br />Schedule B pay items relating to field equipment shall be invoiced as material is delivered <br />and/or installed. <br />Task #24 & 25 ATMS & CONTROLLER TRAINING (INTERMEDIATE) <br />WPS will provide further on-site training sessions for the City staff for controller database <br />and ATMS software training. This training will include printed material, PowerPoint <br />instruction, and hardware. The topics and training agenda will continue and build upon the <br />free timing and coordination strategies covered within task #22, utilizing both test controllers <br />and evaluation of live, field installed intersections. <br />Task #26 - #28: ADDITIONAL FIELD DEPLOYMENT OF CONTROLLER EQUIPMENT <br />WPS will continue scheduling work with City to deploy remainder of field controller <br />equipment and verify successful connection within the ATMS central system. <br />WPS will work with the City to determine the best deployment schedule for the controller <br />upgrade. We recommend an Off-Peak schedule before noon or in the evening after the PM <br />commute. Due to the advance cabinet modifications and controller testing, each intersection <br />should only be in Flash no longer than 10 minutes before normal operation is restored. <br />Schedule B pay items relating to field equipment shall be invoiced as material is delivered <br />and/or installed. <br />Consulting Services Agreement between <br />City of San Leandro and Western Pacific Signal, LLC -Exhibit A <br />
The URL can be used to link to this page
Your browser does not support the video tag.