My WebLink
|
Help
|
About
|
Sign Out
Home
8A Consent 2009 0706
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2009
>
Packet 2009 0706
>
8A Consent 2009 0706
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2009 10:31:28 AM
Creation date
7/6/2009 10:31:20 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Draft Minutes
Document Date (6)
7/6/2009
Retention
PERM
Document Relationships
_CC Agenda 2009 0706
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2009\Packet 2009 0706
Minutes 2009 0615
(Superseded by)
Path:
\City Clerk\City Council\Minutes\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT MINUTES <br /> Page 7 <br />June 15, 2009 <br />City of San Leandro City Council and San Leandro Redevelopment Agency Joint Meeting <br /> <br /> <br /> Resolution No. 2009-090 <br />I., Resolution Accepting the Work for Safe Routes to Schools <br />2006-07, Project No. 06-144-36-016 (provides for acceptance of the work from <br />Columbia Electric, filing of Notice of Completion, and release of bonds). (3134) <br /> <br /> Resolution No. 2009-091 <br />J., Resolution Approving a Contractual Services Agreement <br />with Carollo Engineers, P.C. Relating to a Sanitary and Storm Sewer Infrastructure <br />Study and Impact Fee Analysis for the Downtown Transit Oriented Development <br />(TOD) Area, Project No. 150-83-073 (provides for consulting work to quantify <br />deficiencies in the sanitary and storm sewer systems within the downtown TOD area, <br />determine conceptual solutions to the deficiencies, and develop an impact fee for new <br />development within the area to fund repair of the deficiencies). Cost: $147,563. (2323) <br /> <br /> Resolution No. 2009-092 <br />K., Resolution Allowing the Use of a Sole Source Contract <br />Agreement with Johnson Controls for Building Management Systems (provides for <br />retrofitting the building controls of certain existing City buildings and future new <br />municipal projects). (3159) <br /> <br /> <br /> 9. ITEMS REMOVED FROM CONSENT CALENDAR <br /> <br />Public comments are limited to 3 minutes per speaker per item, subject to adjustment by the <br />Mayor. <br /> <br />None. <br /> <br /> <br />10. ACTION ITEMS <br /> <br />Public comments are limited to 3 minutes per speaker per item, subject to adjustment by the <br />Mayor. <br /> <br /> <br />A.Resolution Authorizing the City Manager to Participate in a Cost-Sharing Agreement <br />with StopWaste.Org for the Proposed Countywide Resource Efficiency Project for <br />Conservation Block Grant (EECBG) allocation to the Green Packages program). <br /> <br />Mr. Bakaldin commented on the relationship between this item and Item 10.B., <br />regarding the Energy Efficiency and Conservation Block Grant (EECBG). He gave a <br />brief background on the item, and introduced Senior Planner Sally Barros. Ms. Barros <br />gave a short PowerPoint presentation, providing information on the Alameda <br />Countywide Resource-Efficiency Project for Greening Existing Buildings and <br />Through standards and <br />specifications for green improvements, the project seeks to improve energy efficiency, <br />water and resource conservation, and indoor air quality. <br /> <br />Staff responded to questions from the Council. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.