My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2005-020
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2005
>
Reso 2005-020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 2:58:51 PM
Creation date
7/29/2009 2:58:46 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
3/7/2005
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 PROJECT DESCRIPTION <br /> TABLE 1-2 <br />PIPELINE SEGMENTS <br /> Crossings Requiring Special Construction <br /> Maximum- Construction <br /> Diameter Method at these <br />Pipeline Segmentsa Location/Alignment Length (feet) (inches) Streets Waterways Railroad Tracks Crossings <br />Northern Pipeline Route Along maintenance dirt road, 3,000 18 Eden Road and Metropolitan Golf NA Bore and Jack <br /> extending west from WPCP Neptune Drive Course drainage (Metropolitan Golf <br /> (City property) channel, San Course Drainage) <br /> Leandro Slough Suspended from <br /> proposed <br /> pedestrian bridge <br /> (San Leandro <br /> Slough) <br />Southern Pipeline Route Along dirt road, extending 2,000 18 Davis Street NA NA Open Trench <br /> southwest from WPCP along <br /> San Leandro Slough <br />EBDA Pipeline (existing) Beo nning at the WPCP, runs 10,000 48 NAb NAb NAb NAb <br /> south through wetland area and <br /> along Neptune Dr. <br />Pipeline connecting EBDA Connecting on Neptune Dr., 100 to 300 18 Monarch Bay Drive NA NA Open Trench <br />Pipeline to proposed water moving west to Monarch Bay <br />recycling plant Golf Complex <br />Pipeline from water recycling Crosses Neptune Dr., south along 1,500 18 North Dike Road, NA NA Open Trench <br />plant to Marina Park Marina Boat Launch pazking lot South Dike Road, <br /> Fairway Drive, and <br /> Monarch Bay Drive <br />a Refer to Figure 2-1 for pipeline segment locations. <br />b The EBDA Pipeline is an existing facility. <br />San Leandro Recycled Water Project 1-9 PSA / 203193 <br />Draft ISMIND <br />
The URL can be used to link to this page
Your browser does not support the video tag.