Laserfiche WebLink
~.u ENVIRONMENTAL CHECKLIST <br /> Less Than <br /> Significant <br /> Potentially With Less Than <br /> Significant Mitigation Significant No <br />Issues (an d Supporting Information Sources): Impact Incorporation Impact Impact <br />VII. HA ZARDS AND HAZARDOUS MATERIALS -- <br />Would the project: <br />a) Create a significant hazard to the public or the <br /> environment through the routine transport, use, or <br /> disposal of hazardous materials? ^ ® ^ ^ <br />b) Create a significant hazard to the public or the <br /> environment through reasonably foreseeable upset <br /> and accident conditions involving the release of <br /> hazardous materials into the environment? ^ ® ^ ^ <br />c) Emit hazardous emissions or handle hazardous or <br /> acutely hazardous materials, substances, or waste <br /> within one-quarter mile of an existing or proposed <br /> school? ^ ® ^ ^ <br />d) Be located on a site which is included on a list of <br /> hazardous materials sites compiled pursuant to <br /> Government Code Section 65962.5 and, as a <br /> result, would it create a significant hazard to the <br /> public or the environment? ^ ® ^ ^ <br />e) For a project located within an airport land use <br /> plan or, where such a plan has not been adopted, <br /> within two miles of a public airport or public use <br /> airport, would the project result in a safety hazard <br /> for people residing or working in the project area? ^ ^ ^ <br />f) For a project within the vicinity of a private <br /> airstrip, would the project result in a safety hazard <br /> for people residing or working in the project area? ^ ^ ^ <br />g) Impair implementation of or physically interfere <br /> with an adopted emergency response plan or <br /> emergency evacuation plan? ^ ^ ® ^ <br />h) Expose people or structures to a significant risk of loss, <br /> injury or death involving wildland fires, including <br /> where wildlands are adjacent to urbanized areas or <br /> where residences are intermixed with wildlands? ^ ^ ^ <br />SETTING OVERVIEW <br />Uncontrolled release of hazardous materials, including rupture of existing utilities and underground <br />pipelines, during the construction phase of the Project would be a potentially significant impact, which is <br />mitigated by Measures HM-1 through HM-4. Post construction, liquid sodium hypochlorite would be <br />San Leandro Recycled Water Projcct 2-2.5 ESA ! ?A3193 <br />Draft ISMIND <br />