Laserfiche WebLink
TABLE OF CONTENTS <br />SAN LEANDRO RECYCLED WATER PROJECT <br />DRAFT INITIAL STUDY/ <br />MITIGATED NEGATIVE DECLARATION <br />ACRONYMS <br />1.0 PROJECT DESCRIPTION <br />1.1 Project Overview-and Background <br />1.2 CEQA Process <br />1.3 Project Objectives and Benefits <br />1.4 Existing Facilities <br />1.5 Proposed Project <br />1.6 Schedule and Construction Methods <br />1.7 Right-of-Way Issues /Permits Required <br />2.0 ENVIRONMENTAL CHECKLIST FORM <br />3.0 MITIGATION MONITORING AND REPORTING PROGRAM <br />4.0 REPORT PREPARERS <br />41 Report Authors <br />4.2 References <br />LIST OF FIGURES <br />1-1 Facility Locations <br />1-2 Proposed Pipeline Alignments <br />1-3 Facilities in Vicinity of the Water Pollution Control Plant <br />LI5T OF TABLES <br />1-1 Project Components <br />1-2 Pipeline Segments <br />. 2-1 SuIIIrllary of Seasonal Constraints on Construction <br />2-2 Archaeological Surveys Conducted within'/4 Mile of the Project Alignment <br />Page <br />111 <br />1.1 <br />1-1 <br />1-2 <br />1-5 <br />1-5 <br />1-6 <br />1-12 <br />1-14 <br />2-1 <br />4-1 <br />4-1 <br />4-1 <br />1-3 <br />1-4 <br />1-11 <br />1-2 <br />1-9 <br />2-16 <br />2-20 <br />Sen Lcandro Recycled Water Projcct 11 FSA / 2Q3193 <br />Draft IS/NIND <br />