Laserfiche WebLink
2.0 ENVIItONMENTAL CHECHI.IST <br />DISCUSSION <br />a,b,c) The Project is limited to construction and operation of recycled water pipeline, water recycling <br />plant, and a disinfection and filtration facility. The Project consists of construction and operation <br />of recycled water. treatment and distribution facilities, and would have a beneficial effect on water <br />supplies. Lmplementation of the Project would allow for Oyster Bay Regional Park, currently not <br />irrigated to be irrigated without using potable water. The new irrigation of Oyster Bay Regional <br />Park and changing to recycled water irrigation for Marina Bay and the par course would not <br />increase the amount of storm water drainage facilities. Therefore, the Project would not increase <br />the need for additional off-site storm water drainage facilities. <br />d) The Project does not require water entitlements; therefore, no impacts would occur. <br />e) The Project is limited to water treatment and distribution facilities, and would not generate <br />wastewater for treatment. Therefore, no adverse effects on the regional wastewater treatment <br />facilities are anticipated. <br />f) Solid waste generation would be limited to construction activities, and would not affect available <br />solid waste disposal capacity in the region. No long-term solid waste generation would be <br />associated with the Project. <br />g) The contractor would be required to comply with all pertinent regulations regarding the disposal <br />of solid waste generated by construction activities; therefore, no impacts would occur. <br />MITIGATION MEAS URES <br />None required or recommended. <br />San Leandro Recycled Water Project Z-49 FSA /203193 <br />Lhak IS/MND <br />