My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2005-020
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2005
>
Reso 2005-020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 2:58:51 PM
Creation date
7/29/2009 2:58:46 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
3/7/2005
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 3.0 <br />MITIGATION SUI~~IlVIARY AND MONITORING AND <br />REPORTING PLAN <br />The following is a summary of mitigation measures integrated into the Project that are adequate <br />to reduce all potentially significant impacts to ales-than-significant level. These are the same <br />exact mitigations measures presented in Section 2.0, above. Following each measure is a table <br />that presents the mitigation monitoring and reporting steps that the City will implement to ensure <br />mitigation compliance. <br />3.1 AESTHETICS <br />No mitigation measures required or recommended. <br />3.2 AGRICULTURAL RESOURCES <br />No mitigation measures required or recommended. <br />3.3 AIR QUALITY <br />Measure AQ-1: Prior to issuance of grading permits, the construction contractor shall submit to <br />the City Engineer a dust abatement program, which shall include the following elements: <br />^ Water all active construction areas at least twice daily, depending on type of operation, and <br />wind exposure; <br />^ Designate a person or persons to oversee the implementation of a comprehensive dust <br />control program and to increase watering, as necessary; <br />^ Construction grading activity should be discontinued in high wind conditions that cause <br />excessive neighborhood dust problems, based on the discretion of the construction <br />inspector; <br />^ Cover all trucks hauling soil, sand, and other loose materials, or require all trucks to <br />maintain at least two feet of freeboard (i.e., the minimum required space between the top of <br />the load and the top of the trailer) in accordance with Section 23114 of the California <br />Vehicle Code during transit to and from the site; <br />^ Apply non-toxic soil stabilizers (e.g., latex acrylic copolymer) if visible soil material is <br />carried onto adjacent public streets; and <br />^ Incorporate Storm Water Best Management Practices throughout the course of the Project. <br />San Leandro Recycled Water Project 3-1 ESA / 203193 <br />IS/MND <br />
The URL can be used to link to this page
Your browser does not support the video tag.