3.0 MITIGATION SUMMARY AND MuNITORING REPORTING PLAN <br />IMPLEMENTATION <br />PROCEDURE MONITORING AND <br />REPORTING ACTIONS MONITORING <br />RESPONSIBILITY MONITORING <br />SCHEDULE <br />1. City includes construction 1. City or qualified biologist 1. City or qualified 1. Prior to <br />limitations and requirements in biologist construction <br />contractor specifications. <br />2. Contractor implements 2. Sign-off by City or qualifted 2. City or qualified 2. During <br />measures in the program. biologist that measures are biologist construction <br /> being implemented. Retain <br /> monitoring reports in City <br /> file. <br />Measure B-2: Avoid disturbing active special-status raptor nests and other nesting birds. <br />If construction activities are scheduled to occur during the nonbreeding season (August 16 <br />through February,l4), no mitigation is required. <br />If construction activities are scheduled to occur during the breeding season (February 15 through <br />August 1 S), the following measures are required prior to issuance of grading permits to avoid <br />potential adverse effects on nesting special-status raptors and other birds: <br />^ A qualifted wildlife biologist will conduct preconstruction surveys of all potential nesting <br />habitat within 500 feet of construction activities. <br />If active nests are found during preconstruction surveys, a 500 foot no-disturbance buffer <br />will be created around active raptor nests and a 250 foot no-disturbance buffer will be <br />created around active nests of other nesting birds during the breeding season or until it is <br />determined that all young have fledged. The size of individual buffers can be adjusted <br />based on an evaluation of the site by a qualified biologist. The evaluation would be based <br />on ambient noise levels, the presence of topographical features that obstruct the line of site <br />from the construction activities to the nest, or observations of the nesting pair during <br />construction based on the level of ongoing disturbance (e.g., road trafflc) and the observed <br />sensitivity of the birds. Site evaluations and buffer adjustments would be done in <br />consultation with the local CDFG representative. <br />If preconstruction surveys indicate that nests are inactive or potential habitat is unoccupied <br />during the construction period, no further mitigation is required. <br />IMPLEMENTATION <br />PROCEDURE MONITORING AND <br />REPORTING ACTIONS MONITORING <br />RESPONSIBILITY MONITORING <br />SCHEDULE <br />1. City includes construction 1. City or qualified biologist 1. City or qualified 1. Prior to <br />limitations and requirements in biologist construction <br />contractor specifications. <br />2, Contractor implements 2. Sign-off by City or qualified 2. City or qualified 2. During <br />measures in the program. biologist that measures are biologist construction <br /> being implemented. Retain <br /> monitoring reports in City <br /> file. <br />San Leandro Recycled Water Proj ec[ 3 - 3 ESA / 203213 <br />IS/MND <br />