3.0 MITIGATION SUMMARY AND MONITORING REPORTING PLAN <br />3.5 CULTURAL RESOURCES <br />Measure CR-1: In the event that any prehistoric or historic subsurface cultural resources are <br />discovered during ground disturbing activities, all work within 50 feet of the resources shall be <br />halted and the City shall .consult with a qualified archaeologist to assess the significance of the <br />find. If any find is determined to be significant, representatives of the City and the qualified <br />archaeologist would meet to determine the appropriate course of action. All significant cultural <br />materials recovered shall be subject to scientific analysis, professional museum curation, and a <br />report prepared by the qualified archaeologist according to current professional standards. <br />IMPLEMENTATION <br />PROCEDURE MONITORING AND <br />REPORTING ACTIONS MONITORING <br />RESPONSH3IL,ITY MONITORING <br />SCHEDULE <br />1. City shall include procedures 1. City reviews construction 1. City 1. Prior to <br />associated with encountering of specifications. construction <br />paleontological resources in <br />construction specifications. <br />2. In the event that paleontological 2. Sign-off by City that 2. City 2. During <br />resources are found, measures have been construction <br />construction shall stop in the implemented. <br />immediate area and a qualified <br />archaeologist shall be <br />consulted. <br />Measure CR-2: The Project proponent shall notify a qualified paleontologist of unanticipated <br />discoveries, made be either the cultural resources monitor or construction personnel and <br />subsequently document the discovery as needed. In the event of an unanticipated discovery of a <br />breas, true, ancUor trace fossil during construction, excavation within 50 feet of the find shall be <br />temporarily halted or diverted until the discovery is examined by a qualified paleontologist. The <br />paleontologist shall notify the appropriate agencies to determine procedures that would be <br />followed before construction is allowed to resume at the location of find. <br />IMPLEMENTATION <br />PROCEDURE MONITORING AND <br />REPORTING ACTIONS MONITORING <br />RESPONSIBILITY MONITORING <br />SCHEDULE <br />1. City shall include procedures I. City reviews construction 1. City 1. Prior to <br />associated with encountering of specifications. construction <br />paleontological resources in <br />construction specifications. <br />Z. In the event that paleontological 2. Sign-off by City that 2. City 2. During <br />resources are found, measures have been construction <br />construction shall stop in the implemented. <br />immediate area and a qualified <br />archaeologist shall be <br />consulted. <br />San Leandro Recycled Water Project 3-5 ESA 1203213 <br />IS/MND <br />