My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2005-020
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2005
>
Reso 2005-020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 2:58:51 PM
Creation date
7/29/2009 2:58:46 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
3/7/2005
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 MITIGATION SUMMARY ANn N~. ~nriTnRrnrr_ uFVnu~rrnrr_ vi srr <br />activities, and shall establish policies and procedures to protect workers and public from potential <br />hazards. The plan shall be prepared according to federal and California OSHA regulations for <br />hazardous materials Health and Safety Plans. <br />Elements of the plan shall include, but not be limited to, the following: <br />^ A discussion of hazardous materials management, including delineation of hazardous <br />material storage areas, access and egress routes, waterways, emergency assembly areas, <br />temporary hazardous waste storage areas; <br />^ Notification and documentation procedures; and <br />^ Spill control and countermeasures, including employee spill prevention/response training <br />IMPLEMENTATION MONITORING AND MONITORING MONITORING <br />PROCEDURE REPORTING ACTIONS RESPONSIBILITY SCHEDULE <br />1. City shall submit a revised 1. City reviews Hazardous 1. City 1. Prior to <br />Hazardous Material Business Plan Materials Business Plans operation of <br />for the WPCP and a new HMBP and retains a copy in City Project. <br />for the water recycling plant to the files. <br />Ci <br />Measure IIl1'I-2: Consultation with- utilities. Prior to fnal design, the proposed pipeline <br />alignment shall be provided to all utilities and pipeline companies that may be within the <br />construction right-of--way to verify no conflict between the proposed alignment and existing <br />utilities. Verification of no utility conflict shall be provided by the utilities to the City. <br />IMPLEMENTATION <br />PROCEDURE MONITORING AND <br />REPORTING ACTIONS MONITORING <br />RESPONSIBILITY MONITORING <br />SCHEDULE <br />I. City shall ensure that existing l . City reviews design 1, City 1. Prior to approval <br />pipelines or utilities in the documents operation of project design <br />proposed pipeline alignment procedures, and all user and documents <br />are accurately located on the agreements. and user <br />design drawings. This agreements. <br />information should be <br />provided to the Contractor. <br />2. Contractor shall implement 2. City signs-off that measures 2. City 2. During <br />requirements as identified in have been implemented. Construction <br />constructions ecifications. <br />Measure HM-3. Notification of USA. Prior to construction, the City shall require that the area <br />of construction be marked and Underground Service Alert (USA) be notified at least 48 hours <br />prior to beginning construction. The City shall require that the USA Ticket be current through <br />the construction phase. In addition, a private underground utility locator shall be retained to <br />verify no utility conflicts within the digging area prior to construction. <br />San Leandro Recycled Water Project 3-7 ESA / 2p3213 <br />IS/MND <br />
The URL can be used to link to this page
Your browser does not support the video tag.