My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2005-020
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2005
>
Reso 2005-020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 2:58:51 PM
Creation date
7/29/2009 2:58:46 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
3/7/2005
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 MITIGATION SUMMARY AND MvNITORING REPORTING PLAN <br />^ Stationary noise sources shall be located as far from sensitive receptors as possible. If they <br />must be located near sensitive receptors, they shall be muffled to the extent feasible and <br />enclosed within temporary sheds. <br />IMPLEMENTATION <br />PROCEDURE MONITORING AND <br />REPORTING ACTIONS MONITORING <br />RESPONSIBILITY MONITORING <br />SCHEDULE <br />I . City shall include noise-control 1. City reviews construction 1. City 1, Prior to <br />requirements in construction specifications. approval of <br />specifications. construction <br /> specifications. <br />2. Contractor shall implement 2. Sign-off by City that 2. City 2. During <br />noise measures. measures have been construction <br /> im lemented. <br />3.12 POPULATION AND HQUSING <br />No mitigation measures required or recommended. <br />3.13 PUBLIC SERVICES <br />No mitigation measures required or recommended. <br />3.14 RECREATION <br />Measure R-1: Pipeline alignment through recreation facilities shall ensure public safety. <br />The City shall require that the contractor will use appropriate signage and pedestrian /user <br />management to communicate safe detours to recreational users. <br />IMPLEMENTATION <br />PROCEDURE MONITORING AND <br />REPORTING ACTIONS MONITORING <br />RESPONSIBILITY MONITORING <br />SCHEDULE <br />1. The City shall coordinate with 1. Incorporate results in 1. City I. During design.. <br />the City of Palo Alto Planning pipeline alignment design. <br />and Community Environment <br />and the City of Mountain View <br />Community Services regarding <br />pipeline routing. City reviews <br />pipeline alignment in design <br />documents <br />2. Contractor implements 2. Sign-off by City that 2. City 2, Prior to and <br />measures in the program. measures have been during <br /> implemented. construction <br /> activities. <br />San Leandro Recycled Water Project 3-1 ~ ESA / 203213 <br />IS/1vfND <br />
The URL can be used to link to this page
Your browser does not support the video tag.