Laserfiche WebLink
4.3 Final Engineers Estimate <br />A final construction cost estimate will be prepared for the project improvements. The estimate <br />will conform to the Caltrans BEES listing as appropriate. <br />4.4 100% PS&E Submittal <br />a) The final PS&E package will be submitted to the City of San Leandro, far review and <br />approval. <br />b) MTCo will submit an Encroachment Permit Application to Caltrans for review and <br />approval. The submittal package will include copies of the PS&E package, the Traffic <br />Analysis, Fact Sheets, and PEER. <br />It is anticipated that two (2) rounds of comments from Caltrans will need to be addressed <br />prior to Caltrans issuing the Encroachment Permit. <br />c} MTCo will meet with the Division of State Architect (DSA) and process the plans for DSA <br />approval for American Disabilities Act Accessibility Guidelines (ADAAG) compliance. <br />100% Deliverables <br />City of San Leandro = 1 Copy Response to 70% Comments <br />3 sets -22 x 34 plans <br />I set - 11 x 17 plans <br />1 set -22 x 34 plans on vellum <br />3 sets -Specifications <br />1 set -Camera Ready Specifications <br />3 copies -Engineers Estimate <br />AutoCAD Format Electronic Files -Plans and Drawings <br />Microsoft Word Format Electronic Files -Specifications <br />Microsoft Excel Format Electronic Files -Engineers Estimate <br />Caltrans = 6 sets - 22 x 34 plans <br />6 set - 11 x 17 plans <br />5 sets -Specifications <br />5 copies -Engineers Estimate <br />5 copies -Fact Sheets <br />5 copies -PEER <br />ACTIA 11: I-880/Washington Avenue Interchange Improvements June 2005 <br />COSL Project No. 144-39-007 Page 24 of 35 <br />