My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2005 Mark Thomas & Company Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2005
>
Agmt 2005 Mark Thomas & Company Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2009 9:27:54 AM
Creation date
8/6/2009 9:27:52 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/20/2005
Retention
PERM
Document Relationships
Reso 2005-092
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1) Construction Details <br />Preliminary construction detail sheets will be prepared for items not covered under the Caltrans <br />Standard Plans. <br />3.2 Engineers Estimate <br />Under this task, MTCo will update the 30% construction cost estimates for the roadway and <br />traffic signal improvements. <br />3.3 Pr~ect Specifications <br />Draft special provisions will be prepared for the project. Special provisions will consist of <br />marked-up Caltrans Standard Special Provisions (SSP's), and new special provisions for items <br />not covered under the Caltrans SSP's. <br />3.4 Fact Sheets <br />Caltrans fact sheets will be prepared for mandatory and advisory design exceptions. Our budget <br />is based on a maximum of 10 design exceptions. <br />3.5 Permit EnaineerinQ Evaluation Report (PEERI <br />Under this task, MTCo will prepare a Draft PEER. <br />3.6 PS&E Submittal -70% <br />Preliminary PS&E packages will be submitted to the City of San Leandro for review and <br />comment. <br />70% Deliverables = 1 copy -Response to 30% Comments <br />5 sets 11x17 plans <br />1 set 22x34 plans <br />2 copies preliminary special provisions <br />2 copies engineers estimate <br />2 copies Draft Mandatory Fact Sheet <br />2 copies Draft Advisory Fact Sheet <br />2 copies Draft PEER <br />Task 4 -100% Plans, Specifications, and Estimate <br />MTCo will respond to the 70% review comments and prepare 100% complete plans for submittal to <br />the City and Caltrans. Under this task we will provide written responses to the 70% review <br />comments and provide justification for each comment that is not incorporated into the design <br />package. We will meet with City of San Leandro, as necessary to resolve issues from the 70% <br />submittal. <br />4.1 Final Plans <br />Comments from the 70% review will be incorporated into the design as appropriate and final <br />roadway, drainage, erosion control, water quality, and traffic plans will be prepared. <br />4.2 Prepare Project Specifications <br />Final project specifications will be prepared for the project. Special provisions will consist of <br />Caltrans Special Provisions, with new specials and inserts clearly marked. These will be <br />combined with boilerplate specifications from either the City of San Leandro or as directed by <br />City of San Leandro. <br />ACTIA 11: I-880/Washington Avenue Interchange Improvements June 2005 <br />COSL Project No. 144-39-007 Page 23 of 35 <br />