Laserfiche WebLink
EXHIBIT A <br />SCOPE OF SERVICES <br />1. iJNDERSTANDING. The City plans to begin construction in September 2005 on the Washington <br />Manor Park Aquatics Center in San Leandro, CA. The building is to include wood roof framing, <br />steel columns, CMU interior and exterior walls on concrete spread footing, interior floor <br />concrete slab on grade with sub-floor electrical, mechanical, and plumbing systems. Pool <br />construction will include reinforced concrete floor and shotcrete walls. Site work includes new <br />concrete pool deck, driveways, fencing, landscaping, sidewalk, signage, and site drainage. <br />Plans and specifications for the project have been prepared by Glass Architects ("Architect"). <br />The City plans to enter into contract with a company experienced in construction ("General <br />Contractor") who will furnish all labor, materials, and equipment required to build the project. <br />This contract is to provide special inspection as required for the construction of the <br />aforementioned improvements. Inspections are to be performed as required by the plans and <br />specifications, building department, and project manager. <br />2. SCOPE OF WORK. <br />a. Provide inspection of reinforced concrete: Review mix design, and steel placement, provide <br />continuous inspection of structural concrete placement, provide concrete cylinder tests. <br />b. Provide inspection of structural masonry: Review grout mix, provide intermittent inspection <br />of block placement, review of reinforcement, and continuous inspection of grout placement. <br />c. Provide inspection of structural steel, including high strength and epoxy bolts. Provide <br />intermittent inspection of single pass fillet welds, and continuous inspection of all other <br />welds. <br />e. Provide written documentation of testing done or observations made far each field trip. <br />£ Provide final summary letter including statement of conformance with plans and <br />specifications. <br />3. TIME OF PERFORMANCE. <br />a. Job site work hours are Monday through Friday Sam to 6pm, observations and inspections <br />will be scheduled during these hours. Observations or inspections scheduled outside of <br />these hours shall be charged at an overtime rate of 1 '/z times the regular hourly rate, except <br />that work on Sundays and Holidays shall be charged at 2 times the regular hourly rate. <br />b. Contractor shall be given a written schedule of work, changes to the schedule shall be <br />issued at least 48 hours in advance of the work. <br />c. Contractor shall perform observation and inspections within 48 hours of request by City. <br />Washington Manor Park Aquarics Center September 26, 2005 <br />Project No. 210-62-002 Page 14 of 16 <br />