My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2004-069
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2004
>
Reso 2004-069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2009 10:16:16 AM
Creation date
8/10/2009 10:16:13 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
5/3/2004
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN LEANDRO DREDGED MATERIALS MANAGEMENT SITE <br />SEDIMENT REMOVAL PROJECT <br />DRAFT MITIGATION MONITORING PLAN <br /> MONITORING <br />IMPACT MITIGATION REQUIRED RESP0I~SIBILITY TIMING <br />Air Qualit <br />5. b. The project could generate Dust shall be kept to a minimum by the following measures: City Engineer During construction act~v~ties <br />and c. substantial amounts of dust <br />- The maximum speed limit for trucks on unpaved roads <br /> through truck movement on within the Roberts landing area shall be set at 15 mph. <br /> unpaved roads on or near the <br /> site. Dust generation could - Trucks shall be inspected and cleaned as necessary before <br /> also occur due to any entering paved roads. <br /> spillage from the trucks <br />- Dirt roadways on site shall have reclaimed water applied to <br /> along paved haul routes them periodically as necessary for dust abatement <br /> which would subsequently <br /> become "resuspended" by - A monitor (project inspector) shall ovexsee the dust <br /> other vehicular traffic. abatement program. <br /> - The paved road segments adjacent to the site shall be kepi <br /> free of dust. <br />Hazards and Hazardous Materials <br />8.a-b. Inadvertent release of large • Any diesel fuel temporarily srored at or near the. DMMS during City Engineer During construction activities <br /> quantities of hazardous construction shall be appropriately secured and protected to <br /> materials into the ensure that no accidental spillage occurs. <br /> environment could adversely <br />~ <br /> impact soil, surface waters, <br /> or groundwater quality. <br />Trans ortation/Circulation <br />10.a.,b. Analysis of the proposed • Limit construction to between the hours of 8:00 a.m. and City Engineer During construction activities <br /> hau} route found that the 5:00 p.m. Monday through Friday, excluding holidays. <br /> project would significantly <br />affect roadway segments and <br />' Truck traffic shall not be permitted on San Leandro City streets <br /> intersections if truck traffic during heavy traffic hours: 7:00 a.m. to 8:00 a.m. and 5:00 p.m. <br /> were to increase delay or to 6:00 p.m. The last load shall not leave the DMMS later than <br /> reduce capacity during peak 4:00 p.m. i <br />San Leandro Dredged Materials Management Site Sediment Removal Project -Draft MMP <br />
The URL can be used to link to this page
Your browser does not support the video tag.