Laserfiche WebLink
SAN LEANDRO DREDGED MATERIALS MANAGEMENT SITE <br />SEDIMENT REMOVAL PROJECT <br />DRAFT MITIGATION MONITORING PLAN <br /> MONITORING <br />IMPACT MITIGATION REQUIRED RESPONSIBILITY TIMING <br /> traffic periods. <br />10. e. The proposed project would A traffic- control plan shall be prepared and complied with. The City Engineer Prior to the start of <br /> have temporary impacts on contractor shall prepare a traffic control plan in accordance with construction <br /> traffic flow. professional engineering standards prior to the start of <br /> construction. The traffic control plan shall include the following <br /> requirements: • During construction <br /> a. The contractor shall adhere to the designated haul route, and activities <br /> truck haul route signs will be put up along the haul route on <br /> Fairway Drive, Monarch Bay Drive, and Marina Boulevard. <br /> b. To minimize disruption of school routes and emergency <br /> vehicle access, the contractor shall notify affected entities <br /> along haul route of the timing, location, and duration of the <br /> additional truck traffic. The contractor shall post signage <br /> along undesignated local truck routes. <br /> c. Coordinate with local transit agency to warn of potential <br /> temporary disruption of bus schedule along haul route; this <br /> may include posting of signage at stops and on buses. <br />Bio1o <br />14.a-c. The DMMS provides habitat • The City shall regularly inspect the project site during and City Engineer, Project During construction <br /> for shorebirds and immediately following the Dredge Material Removal project. A Biologist activities <br /> marshlands are located biologist shall monitor the grading and removal operation to <br /> adjacent to the site; ensure that nearby sensitive habitats, particularly wetlands, are <br /> therefore, offhaul activities not adversely affected. <br /> within the project vicinity <br /> could adversely affect A construction exclusion zone shall be established beyond the • Prior to the start of <br /> shorebirds and marshlands. outer top of the existing eastern, southern, and northern levees in construction <br /> which no construction equipment or activity would be permitted. <br /> The exclusion zone shall be marked by a qualified biologist in <br /> the field to protect the environmentally-sensitive wetlands which <br /> abut the DMMS. In addition, the proposed haul routes through <br /> the Roberts Landing areas shall be clearly identified. <br />San Leandro Dredged Materials Management Site Sediment Removal Project -Draft MMP <br />