My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2004-069
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2004
>
Reso 2004-069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2009 10:16:16 AM
Creation date
8/10/2009 10:16:13 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
5/3/2004
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN LEANDRO DREDGED MATERIALS MANAGEMENT SITE <br />SEDIMENT REMOVAL PROJECT <br />DRAFT MITIGATION MONITORING PLAN <br /> MONITORING <br />IMPACT MITIGATION REQUIRED RESPONSIBILITY TIMING <br /> traffic periods. <br />10. e. The proposed project would A traffic- control plan shall be prepared and complied with. The City Engineer Prior to the start of <br /> have temporary impacts on contractor shall prepare a traffic control plan in accordance with construction <br /> traffic flow. professional engineering standards prior to the start of <br /> construction. The traffic control plan shall include the following <br /> requirements: • During construction <br /> a. The contractor shall adhere to the designated haul route, and activities <br /> truck haul route signs will be put up along the haul route on <br /> Fairway Drive, Monarch Bay Drive, and Marina Boulevard. <br /> b. To minimize disruption of school routes and emergency <br /> vehicle access, the contractor shall notify affected entities <br /> along haul route of the timing, location, and duration of the <br /> additional truck traffic. The contractor shall post signage <br /> along undesignated local truck routes. <br /> c. Coordinate with local transit agency to warn of potential <br /> temporary disruption of bus schedule along haul route; this <br /> may include posting of signage at stops and on buses. <br />Bio1o <br />14.a-c. The DMMS provides habitat • The City shall regularly inspect the project site during and City Engineer, Project During construction <br /> for shorebirds and immediately following the Dredge Material Removal project. A Biologist activities <br /> marshlands are located biologist shall monitor the grading and removal operation to <br /> adjacent to the site; ensure that nearby sensitive habitats, particularly wetlands, are <br /> therefore, offhaul activities not adversely affected. <br /> within the project vicinity <br /> could adversely affect A construction exclusion zone shall be established beyond the • Prior to the start of <br /> shorebirds and marshlands. outer top of the existing eastern, southern, and northern levees in construction <br /> which no construction equipment or activity would be permitted. <br /> The exclusion zone shall be marked by a qualified biologist in <br /> the field to protect the environmentally-sensitive wetlands which <br /> abut the DMMS. In addition, the proposed haul routes through <br /> the Roberts Landing areas shall be clearly identified. <br />San Leandro Dredged Materials Management Site Sediment Removal Project -Draft MMP <br />
The URL can be used to link to this page
Your browser does not support the video tag.