Laserfiche WebLink
• Bridge and Pipeline upgrade options and recommendations <br />• Damaged bridge repair plan and recommendation <br />7. Prepare a Final Report incorporating comments from the draft document <br />8. Tree damage to riveted bridge - Prepare a Repair Plan and Construction Cost Estimate to <br />rectify the (tree) damage. The study Repair Plan will include a one sheet 11"x17" <br />General Plan -Plan, Elevation & Detail, with key notes to describe the type, size and <br />location of repair construction. <br />City Tasks: <br />1. Provide riveted bridge as-built drawings <br />2. Pothole at welded bridge foundation sides to determine footing dimensions <br />3. Provide video condition survey of both pipelines <br />4. Provide site topographic survey, including channel section elevations, bridge chord and <br />top of pipe elevations at each abutment. <br />5. Provide ACFCD Encroachment permit <br />6. Provide standard title block <br />7. Provide standard front end specifications <br />Product: <br />Reports shall be in word format. Plans and drawings shall be in latest AutoCAD version <br />1. Draft Report, (3 copies) <br />2. Final Report, (4 copies plus electronic file) <br />3. Repair Plan (to rectify tree damage), equivalent to Project Study Report with General <br />Plan design; Construction Estimate (4 copies plus electronic file) <br />4. Construction Documents (if authorized) developed from Repair Plan: <br />• 30 % submittal (5 sets of plans) <br />• 70 % submittal (5 sets of plans, 1 set of specifications) <br />• Submit structural plans for Building Department review and respond to any <br />comments <br />• Final Submittal (1 set of plans, signed mylar plus electronic file of plans and <br />specifications) <br />Preda St-SL Creek Sanitary Sewer Upgrade Page 16 of 20 <br />Project No. 593-52-121 <br />