Laserfiche WebLink
Exhibit B <br />ENGINEER'S ESTIMATE <br />FOR <br />Doolittle Drive Entryway Improvements -Adams to Davis Str. <br />8/19/2004 <br />UNIT <br />ITEM DESCRIPTION QUANTITY UNIT PRICE AMOUNT <br />1 Mobilization, Insurance & Bonding 1 LS $12,000 $12,000.00 <br />2 Traffic Control 1 LS $0 $0.00 <br />3 Site Demolition 1 LS $5,000 $5,000.00 <br />4 Grading and Drainage, Site Construction 1 LS $10,000 $10,000.00 <br />5 Site Electrical 1 LS $4,000 $4,000.00 <br />6 Irrigation 1 LS $25,000 $25,000.00 <br />7 Planting (Palm Trees in raised Concrete Boxes) 13 EA $7,350 $95,550.00 <br />8 Planting 8 EA $475 $3,800.00 <br />9 Landscape Maintenance 1 LS $0 $0.00 <br />10 Factory Prime and Paint Existing Electroliers 12 EA $1,500 $1$,000.00 <br />SUBTOTAL CONSTRUCTION $173,350.00 <br />Permit Fees, Utility Costs other Misc Fees .................................................. $0.00 <br />Contingencies.....(construction costs only)........ Percentage: 15% 26,002.50 <br />Design ..................................................................................... 0.00 <br />Land acquisition costs 0.00 <br />Construction En~ineerin~, Inspection & Admin . ..................................... 0.00 <br />Note: <br />Irrigation work may be removed from this estimate if it is confirmed that the Golf Course Concessionaire <br />made provisions for irrigation for the plants as discussed earlier during design with its representative <br />